is gone. The upper two floors were not pointed with cement<br />

and thus retain some mud mortar.<br />

The building has no plinth and rests instead on the<br />

ground plane of the rear garden area.<br />

Proposed Res<strong>to</strong>ration<br />

The existing bricks on the façade wall will be preserved<br />

and reused wherever possible. Since parts of the ground<br />

floor wall require new bricks, several wall sections will<br />

be dismantled and reconstructed with both existing and<br />

salvaged ma apa bricks in mud mortar.<br />

Areas with cement mortar will be re-pointed with traditional<br />

yellow mud mortar. Severely damaged and missing<br />

bricks will be replaced with salvaged bricks matching<br />

the surrounding brick size and coursing.<br />

A new s<strong>to</strong>ne plinth has been designed <strong>to</strong> provide a continuous<br />

base around the entire building, as is typical in<br />

Newar architecture.<br />

December 2013<br />

358