Harishankara Temple<br />

(Hariśaṅkara)<br />

January - August <strong>2016</strong><br />

Replicating two pillars of the ambula<strong>to</strong>ry, repairing / res<strong>to</strong>ring the remaining 18 pillars,<br />

repairing the 20 molded plates on <strong>to</strong>p of the pillars, one beam, the 24 colonnettes,<br />

the southern and eastern doorways, repairing two of the 20 tympana,<br />

and the stepped cornices of all three levels<br />

(Niels Gutschow and Raju Roka)