KVPT’s Patan Darbar Earthquake Response Campaign - Work to Date - September 2016

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Top Left<br />

South Taleju Tower after res<strong>to</strong>ration<br />

of <strong>to</strong>p roof tier. Upper scaffolding<br />

is being removed for the<br />

next phase of work. Sundari Cok<br />

East Wing can be seen in the foreground<br />

under res<strong>to</strong>ration. As seen<br />

from the Bhandarkhal Tank.<br />

July, <strong>2016</strong><br />

Top Right<br />

South Taleju agam with Top tier<br />

roof res<strong>to</strong>ration complete, with<br />

scaffolding partially dismantled <strong>to</strong><br />

allow for work on the middle roof.<br />

Seen from North Taleju Temple.<br />

July 03, <strong>2016</strong><br />

Bot<strong>to</strong>m Left<br />

Middle tier roof waterproof membrane<br />

has been laid over marine<br />

grade plywood, wooden battens are<br />

installed, and laying of mud bed<br />

and clay tiles is in progress.<br />

July 17, <strong>2016</strong><br />

Bot<strong>to</strong>m Right<br />

Finishing the setting of the traditional<br />

jhingati clay roof tiles in<strong>to</strong><br />

the yellow mud bed on the middle<br />

tier roof.<br />

July 18, <strong>2016</strong><br />