Top Left<br />

Replacing missing parts of the cornice<br />

above the southern doorway.<br />

Top Right<br />

Repairing the first of twenty<br />

tympana.<br />

Bot<strong>to</strong>m Left<br />

Repairing the molded plates on <strong>to</strong>p<br />

of the pillars (left)<br />

Bot<strong>to</strong>m Right<br />

Repairing the <strong>to</strong>p of a pillar. In the<br />

background, the almost completely<br />

repaired southern doorway, without<br />

its threshold in s<strong>to</strong>ne.<br />

Pho<strong>to</strong>graphs Anil and Bijay Basukala,<br />

July 17, 19 and 24, <strong>2016</strong><br />