KVPT’s Patan Darbar Earthquake Response Campaign - Work to Date - September 2016

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The aedicules<br />

The eight aedicules, niches with a stepped pediment<br />

housing the eight guardians of the universe (aṣṭadikpāla),<br />

are well preserved.<br />

The doorways<br />

The southern and eastern doorways required extensive<br />

repairs while the northern and western doorways exhibit<br />

only minor damage. The guiding rule was <strong>to</strong> retain as<br />

much of the original fabric as possible. The southern<br />

door required much care as the lintel was broken, with<br />

damage beyond repair. The carved surfaces above the<br />

door opening and on the extended lintel ends were removed<br />

from the old lintel <strong>to</strong> a depth of some five cm and<br />

joined <strong>to</strong> the new lintel using bamboo pegs. At all four<br />

doors, the lower parts of the Eight Planets (aṣṭagraha) on<br />

the lintel ends have broken away. Only one of these was<br />

found in the debris. The others will have <strong>to</strong> be replaced<br />

and recarved. Structural damages required replacements<br />

including the introduction of galvanized nuts and bolts:<br />

at the eastern doorway eight, and at the southern doorway<br />

four.<br />

As of mid-<strong>September</strong>, the southern and eastern doorways<br />

are almost completed. The repair of the northern<br />

and western doorways is in progress. All doorways will<br />

be completed by December <strong>2016</strong>.<br />

The corner pillars of the sanctum<br />

The four corner pillars had their bot<strong>to</strong>m tenons preserved<br />

while the breakaway of the tenon at the <strong>to</strong>p caused<br />

loss of fabric on all four pillars. Replacement work was<br />

completed in April <strong>2016</strong>.<br />

The inner frame of the doorways<br />

<strong>Work</strong> on the four inner frames will start in November<br />

<strong>2016</strong>.<br />

The inner threshold of the four doorways<br />

The southern and western thresholds are broken; the remaining<br />

two need minor repairs. This damage has not<br />

yet been assessed in cooperation with s<strong>to</strong>ne masons. Replacements<br />

will be used until March 2017.<br />

Of the 20 base s<strong>to</strong>nes of the pillars of the ambula<strong>to</strong>ry,<br />

featuring a lion bust, two will have <strong>to</strong> be replaced and<br />

seven are in need of repair. Of the 20 carved s<strong>to</strong>nes of<br />

the intercolumniations, six will have <strong>to</strong> be replaced, and<br />

the remaining ones repaired. The work will be complete<br />

in March <strong>2016</strong>.<br />

Summary<br />

Most of the woodwork will be completed in November<br />

<strong>2016</strong>, and the s<strong>to</strong>ne work will be complete in March.<br />

Based on these assumptions, the ground floor will be in<br />

place in early May 2017, provided the foundation of reinforced<br />

concrete is installed in March 2017.<br />

First Level<br />

Twelve windows need minor repairs. One of 28 struts<br />

is broken but can be repaired. The entire level will be in<br />

place by the end of 2017.<br />

Second level<br />

Four windows, eight aedicules (niches) and 20 struts<br />

need minor repairs.<br />

Third Level<br />

Four windows, eight miniature aedicules and 12 struts<br />

need minor repair.<br />

The door leaves<br />

No trace of the latticed door leaves survives. Replacements<br />

will be made in November <strong>2016</strong>.<br />