Side I of the four-sided column<br />

“MP 7” after res<strong>to</strong>ration.<br />

Pho<strong>to</strong> (black-and-white) taken by<br />

Ashesh Rajbansh, March 30, <strong>2016</strong>.<br />

Right<br />

<strong>Patan</strong>, 6 April <strong>2016</strong><br />

Detail showing the efforts undertaken<br />

<strong>to</strong> res<strong>to</strong>re column “MP 7”<br />

in order <strong>to</strong> save as much of the<br />

original material as possible and<br />

retain the original design intention.<br />

Carved timber was added in the<br />

upper part of the column replacing<br />

the damaged part (including the<br />

tenon).<br />

Holes that had been made for the<br />

installation of planking between<br />

the northern columns were repaired.<br />