23.10.2016 Views

KVPT’s Patan Darbar Earthquake Response Campaign - Work to Date - September 2016

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Top left<br />

Tentative reassembly of the<br />

res<strong>to</strong>red, renewed, and repaired<br />

elements of the timber cornice<br />

of South Manimaṇḍapa . New<br />

timber carving and reinforcement<br />

through steel bars was necessary <strong>to</strong><br />

maintain as much of the original<br />

material as possible.<br />

<strong>Patan</strong>, 11 April <strong>2016</strong><br />

Bot<strong>to</strong>m Left<br />

New timber carving and reinforcement<br />

through steel bars was<br />

necessary <strong>to</strong> maintain as much of<br />

the original material as possible.<br />

The pho<strong>to</strong>s show a part of the lowest<br />

layers, lotus flower alternating<br />

with bells (Nev. palesva), seen from<br />

front and back.<br />

299

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!