KVPT’s Patan Darbar Earthquake Response Campaign - Work to Date - September 2016

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Top Left and Right<br />

Deteriorated waterproof membrane<br />

is removed and marine grade plywood<br />

is laid over the planking.<br />

KVPT, November 11 and 12, 2014<br />

Middle Left and Right<br />

Roofing installation at lower roof.<br />

Planking, marine grade plywood,<br />

and waterproofing membrane are<br />

in place, and battens have been installed<br />

<strong>to</strong> hold the mud mortar bed.<br />

KVPT, November 20 and 21, 2014<br />

Bot<strong>to</strong>m Left and Right<br />

Roof mason Awale lays traditional<br />

jhingati roof tile in the yellow mud<br />

bed. At right, the lower two roofs<br />

are seen after the laying of tradtional<br />

terra cotta tile (jhingati).<br />

KVPT, November 17 and 20, 2014<br />