19.12.2012 Views

Environmental Management System Manual - Miami-Dade Portal

Environmental Management System Manual - Miami-Dade Portal

Environmental Management System Manual - Miami-Dade Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Miami</strong>-<strong>Dade</strong> Transit<br />

EMS Internal Audit<br />

EP 4.5.5-1FB Internal EMS Audit Checklist / Report<br />

EMS Audit Team:<br />

Department Audited:<br />

Date of Audit:<br />

Page 11 of 12<br />

Criteria Audit Question Required Evidence Audit Observations C N<br />

Internal Audits<br />

4.5.5 1) Are procedures in place for periodic audits of environmental<br />

management system?<br />

4.5.5 2) Does the audit checklist cover the elements of ISO 14001?<br />

Does the audit cover conformance to the EMS?<br />

Print date: 01/25/2010<br />

Date of issue: 01/25/2010<br />

Effective until date: 12/31/2010<br />

Persons responsible: Akbar Sharifi<br />

Areas of application: Metromover Shop<br />

Document location: Metromover and MDT Main Office<br />

Review Internal Audit Procedures.<br />

Confirm all elements of ISO 14001<br />

are addressed by answering the<br />

questions included on this checklist.<br />

4.5.5 3) Have the results of audits been reported to management? Confirm that audit results are<br />

reviewed by management. (e.g.,<br />

included on distribution and<br />

management review.)<br />

4.5.5 4) Do audit procedures address audit scope, frequency,<br />

methodology, responsibilities, and requirements for conducting<br />

and reporting audits?<br />

<strong>Management</strong> Review<br />

4.6 1) Does top management routinely review the EMS for its<br />

suitability, adequacy, and effectiveness?<br />

4.6 2) The <strong>Management</strong> Review Agenda should include the<br />

following items: status of objectives and targets, corrective and<br />

preventive actions, audit reports, interested party issues, and<br />

regulatory compliance.<br />

4.6 3) Has the management review process considered possible<br />

changes to <strong>Environmental</strong> Policy, objectives and other EMS<br />

elements?<br />

Review the audit procedure.<br />

Verify the <strong>Management</strong> Review<br />

Procedure. Ensure that the<br />

management review records have<br />

been completed and documented.<br />

Review <strong>Management</strong> review<br />

meeting minutes.<br />

Review possible program changes<br />

as a result of the management<br />

review process.<br />

This completed form and related attachments are records maintained in the EMS.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!