Environmental Management System Manual - Miami-Dade Portal
Environmental Management System Manual - Miami-Dade Portal
Environmental Management System Manual - Miami-Dade Portal
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Miami</strong>-<strong>Dade</strong> Transit Verification Originator Revised Approved Issued<br />
EMS Procedure<br />
EP-4.6-1 <strong>Management</strong> Review Procedure<br />
5.2 <strong>Management</strong> Review Meetings<br />
Initials<br />
Akbar<br />
Sharifi, P.E.<br />
Akbar<br />
Sharifi, P.E.<br />
Date 10/21/2009 02/15/2010<br />
5.2.1 The <strong>Management</strong> Review meetings, shall be scheduled and conducted by the EMS<br />
<strong>Management</strong> Representative, and attended by Senior <strong>Management</strong> and the EMS Team.<br />
This meeting shall be documented with meeting minutes and attendance recorded on ED-<br />
4.6-3 (F) Attendance Sign-in Sheet.<br />
5.2.2 During the <strong>Management</strong> Review meetings, the current state of the EMS shall be reviewed<br />
as well as an update (progress and/or corrective actions) on the set Objectives, Targets and<br />
Programs. In addition, the possible need for changes to the <strong>Environmental</strong> Policy;<br />
Objectives, Targets and Programs; and other elements of the EMS will be discussed.<br />
5.2.3 Results of the <strong>Environmental</strong> Audits and appropriate modifications shall also be discussed<br />
at the <strong>Management</strong> Review meetings. Changes to circumstances and the commitment to<br />
continual improvement should also be considered in this discussion.<br />
5.2.4 Recommended changes must be viable and not cause a significant disruption to the MDT<br />
Metromover Facility's current or planned operations.<br />
5.2.5 <strong>Management</strong> Review meetings and the resulting changes will ensure that the EMS:<br />
a) continues to be suitable, adequate and effective in light of the nature and scale of the<br />
MDT Metromover Facility's environmental impacts and operations;<br />
b) conforms to the imposed planned arrangements of MDT Metromover Facility's EMS and<br />
is properly implemented and maintained;<br />
c) is in compliance with MDT Metromover Facility's legal and other obligations; and<br />
d) will satisfy the MDT Metromover Facility's commitment to continual improvement during<br />
the coming year.<br />
5.3 Documentation and Distribution<br />
5.3.1 Detailed meeting minutes of the <strong>Management</strong> Review will be taken. The meeting minutes<br />
will include:<br />
a) discussions undertaken and conclusions met for each of the topics and items included in<br />
the agenda;<br />
b) action items;<br />
c) assigned responsibilities;<br />
d) a list of all participants; and<br />
e) a tentative date or range of dates for the next <strong>Management</strong> Review meeting.<br />
5.3.2 After the completion of a <strong>Management</strong> Review meeting, draft-meeting minutes will be<br />
circulated to all participants within two weeks. Participants are to review the minutes for<br />
accuracy, ensuring their comments, ideas and contributions were accurately documented<br />
Print date: 2/22/2010 WARNING! This document is uncontrolled when printed. Page 4 of 5<br />
Previous versions or printed copies may be obsolete. Verify current revisions using the EMS web site.