19.12.2012 Views

Environmental Management System Manual - Miami-Dade Portal

Environmental Management System Manual - Miami-Dade Portal

Environmental Management System Manual - Miami-Dade Portal

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Miami</strong>-<strong>Dade</strong> Transit Person resp Prepared by Reviewed by Approved by<br />

EMS Document<br />

ED 4.3.3-2 Objective & Target Action Plan<br />

Print date: 06/18/2009<br />

Date of issue: 12/31/2009<br />

Effective until date: 12/31/2010<br />

Akbar Sharifi, P.E.<br />

Persons responsible: S. Alvarez and F. Wright<br />

Areas of application: Maintenance Facility<br />

Document location: MDT Main Office and Maintenance Facility<br />

Akbar Sharifi, P.E.<br />

Document Name: Reduction of Electric Use Facility Affected: Maintenance Facility and Various Stations<br />

Document No: ED 4.3.2 – AP#002 Relevant Process: Facility Electricity <strong>System</strong><br />

Start Date: 07/01/2009 Related Significant Aspect or Legal and Other Requirement:<br />

Date Fully Completed: Energy Efficiency<br />

1.0 Person Responsible for Overall Action Plan: Steve Alvarez, Facility Manager<br />

2.0<br />

Goal Statement: 5% reduction in the amount of electricity use during 2009 – 2010 by improving, training and educating facility employees on the proper energy<br />

efficiency management. In addition, replace all existing light bulbs with energy efficient bulbs.<br />

3.0 Objective: Reduce energy use<br />

4.0 Measurable Target and completion date: Reduce by 5% the electricity use by December 31, 2010.<br />

5.0<br />

Strategy: To establish, implement and maintain the reduction of electricity by establishing baselines, replacing light bulbs and other equipment with energy efficient<br />

bulbs and equipment, and training employees.<br />

6.0 Program Plan<br />

Task Responsible Individual Implementation Schedule<br />

Establish a baseline by reviewing the<br />

past two years of bills associated with<br />

electricity use.<br />

Evaluate options for reduction of<br />

electricity use by 5% from baseline.<br />

Review findings with the EMS team by<br />

07/2/09 to determine methods for<br />

reduction.<br />

Date Task<br />

Completed<br />

S. Chayt June 8, 2009 July 16, 2009<br />

A. Sharifi 06/18/2009 to 07/02/2009 06/18/2009<br />

Comments<br />

Page 1 of 3<br />

See EMS Team meeting minutes<br />

from 6/18/2009.<br />

See EMS Team meeting minutes<br />

from 6/18/09 for additional details<br />

regarding methods discussed.<br />

This is a printed copy of the original and will not be kept up-to-date.<br />

Earlier versions of this document may be obsolete and should be removed from points of use.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!