<strong>Miami</strong>-<strong>Dade</strong> Transit Person resp Prepared by Reviewed by Approved by<br />
EMS Document<br />
ED 4.3.3-2 Objective & Target Action Plan<br />
Print date: 06/18/2009<br />
Date of issue: 12/31/2009<br />
Effective until date: 12/31/2010<br />
Akbar Sharifi, P.E.<br />
Persons responsible: S. Alvarez and F. Wright<br />
Areas of application: Maintenance Facility<br />
Document location: MDT Main Office and Maintenance Facility<br />
Akbar Sharifi, P.E.<br />
Task Responsible Individual Implementation Schedule<br />
f) Reduce tire waste generation by acquiring<br />
tires with longer useful life and/or recycling<br />
g) Reduce/Eliminate industrial waste<br />
discharges by implementing Spill<br />
Prevention, Control and Countermeasure<br />
(SPCC) plan and Best <strong>Management</strong><br />
Practices.<br />
h) Reduce generation of used rags and<br />
cotton gloves increasing the useful life of<br />
rags/cotton gloves, implementing better<br />
tracking system and purchasing new trains<br />
that require less maintenance.<br />
i) Reduce used batteries generation by<br />
implementing tight control with strict<br />
standard operating procedures (i.e., one on<br />
one exchange) and acquiring rechargeable<br />
batteries that require less recycling and<br />
disposal.<br />
j) Reduce shop and office recyclables (i.e.,<br />
paper and cardboard) implementing new<br />
recycling equipment and more electronic<br />
communication.<br />
Evaluation of work instructions (SOPs)<br />
relating to this action plan. Have written<br />
SOPs in place, and reviewed by the EMS<br />
Team for possible revisions as needed.<br />
Measure quarterly waste generation to track<br />
progress toward this action plan and<br />
present to the EMS Team.<br />
Prepare and present a semi-annual<br />
progress reports on this action plan for the<br />
scheduled <strong>Management</strong> Review meetings.<br />
Date Task<br />
Completed<br />
S. Alvarez Complete by 12/31/2009 On going<br />
S. Alvarez Complete by 12/31/2009 On going<br />
S. Alvarez Complete by 12/31/2009 On going<br />
S. Alvarez Complete by 12/31/2009 On going<br />
S. Alvarez Complete by 12/31/2009 On going<br />
S. Alvarez and F. Wright Complete by 10/30/2009 02/05/2010<br />
S. Alvarez and F. Wright<br />
S. Alvarez, F. Wright,<br />
and A. Sharifi<br />
Manifests, Weekly Tracking and<br />
Inspections<br />
02/25/2010<br />
Prior to each scheduled meeting. 02/25/2010<br />
Comments<br />
Page 3 of 4<br />
SOPs must be completed, reviewed<br />
and approved for the employee<br />
training by 04/15/2010<br />
Tracking records and inspection<br />
records kept in the Safety<br />
Department.<br />
Steve will gather the necessary<br />
information from the responsible<br />
individuals for each task.<br />
This is a printed copy of the original and will not be kept up-to-date.<br />
Earlier versions of this document may be obsolete and should be removed from points of use.