17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

March, 2005 TABLE 3-2<br />

WQUAL5-2<br />

WQUAL5-3<br />

WQUAL5-4<br />

WQUAL5-5<br />

Water Quality - Issues, Actions and Responsible Parties<br />

Seek funding for projects that promote the protection and improvement <strong>of</strong> water quality, including:<br />

a. Projects to review and collect water quality data on <strong>WRIA</strong> <strong>62</strong> streams where data is lacking or needed.<br />

b. Projects to identify and assess point and non-point sources <strong>of</strong> impairments, develop and implement restoration /<br />

mitigation plans and monitor effectiveness <strong>of</strong> clean up efforts.<br />

c. Projects to protect unimpaired / healthy streams.<br />

Identify funding to continue operation <strong>of</strong> pressure transducers and field water quality monitoring within Calispell,<br />

Davis, Skookum and Kent sub-basins. The Kalispel Tribe will take on the responsibility <strong>of</strong> maintaining the seven<br />

stream gages (installed during Phase II) and downloading flow information for the Calispell, Davis, Skookum and<br />

Kent sub-basins.<br />

Implementing body<br />

Implementing body, Kalispel<br />

Tribe<br />

Implement the water quality monitoring plan developed in the Phase 2 Level 2 report. The recommendations <strong>of</strong><br />

this plan are: 1. Coordinated TMDL development and implementation in WA and ID; 2. Conduct biological and<br />

baseline monitoring in <strong>WRIA</strong> <strong>62</strong> sub-basins that drain from WA into ID; 3. Conduct temperature studies on the<br />

Pend Oreille River between Box Canyon and Canada; 4. Develop water quality datasets that are comparable<br />

between <strong>WRIA</strong> <strong>62</strong> waterbodies; 5. Conduct water quality monitoring in sub-basins where population growth is<br />

Implementing body, <strong>Ecology</strong><br />

predicted; 6. Develop and implement a stormwater program for urban areas; 7. Recommend <strong>Ecology</strong> upgrade the<br />

Metaline Falls monitoring site to a core monitoring location; 8. Increase the use <strong>of</strong> coordinated and comparable<br />

biological monitoring; 9. Require the use <strong>of</strong> water quality monitoring plans, QAPPs and comparable protocols;<br />

10. Develop a <strong>WRIA</strong> <strong>62</strong> data management system; 11. Install freeze protection on automated equipment in <strong>WRIA</strong><br />

<strong>62</strong> tributaries.<br />

Consider any regulations that may help reduce the impacts <strong>of</strong> population growth on water quality. For example,<br />

recommend that the County consider aquifer recharge areas in Critical Areas Ordinance.<br />

Pend Oreille County<br />

023-1289-003.3040<br />

Page 3 <strong>of</strong> 3<br />

CODE ISSUE / ACTION<br />

OBLIGATED OR<br />

RESPONSIBLE ENTITY JUSTIFYING STATUTE(S)<br />

WQUAL5: The 303(d) list identifies impaired waterbodies and requires <strong>Washington</strong> <strong>State</strong> to work towards cleaning up impaired waterbodies and<br />

establishing TMDLs. However there is a need to identify an appropriate process to protect unimpaired waters in <strong>WRIA</strong> <strong>62</strong> that meet or exceed applicable<br />

water quality standards.<br />

RCW 90.82.005; RCW<br />

90.82.040 Notes: Findings-2003<br />

1st sp.s.c 4; RCW<br />

90.82.090(2)&(7).<br />

WQUAL5-1<br />

Review <strong>Ecology</strong>'s current water quality assessment and identify waterbodies within <strong>WRIA</strong> <strong>62</strong> to implement:<br />

a. Projects to review and collect water quality data on <strong>WRIA</strong> <strong>62</strong> streams where data is lacking or needed.<br />

b. Projects to identify and assess point and non-point sources <strong>of</strong> impairments, develop and implement restoration / Implementing body<br />

mitigation plans and monitor effectiveness <strong>of</strong> clean up efforts.<br />

c. Projects to protect unimpaired / healthy streams.<br />

Golder Associates Tb 3-1 to 3-7 <strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> Responsible Parties

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!