March, 2005 -49- 023-1289-003.3040<br />

The lake is scheduled to be held at 2,055 ft amsl between November 15, 2004 and March 31, 2005.<br />

The 2004 Biological Opinion for the Columbia River Power System (which includes the Pend Oreille<br />

River system) will establish the schedule for Lake Pend Oreille elevations. A schedule <strong>of</strong> two or<br />

three years high (i.e. 2,055 ft amsl) followed by one year low (2,051 ft amsl) is being considered.<br />

The schedule for Lake Pend Oreille elevation will be confirmed on an annual basis by the Technical<br />

Management Team (TMT). The TMT was established by the 2000 Biological Opinion by the<br />

National Marine Fisheries Service and the US Fish and Wildlife Service to advise the operating<br />

agencies on dam and reservoir operations. Additional information on the TMT is provided in Section<br />

4.1.4.4.1.<br />

4.1.4.1.2 FERC Licensed Dams<br />

Federal Energy Regulatory Commission (FERC) licensing is required <strong>of</strong> all non-federal hydroelectric<br />

power projects that affect navigable waters, occupy U.S. lands, use water or hydropower at a<br />

government dam, or affect the interests <strong>of</strong> interstate commerce. FERC licenses are issued for periods<br />

between 30-50 years. After an initial FERC license expiration, interim yearly permits may be issued<br />

until the facility completes relicensing. Following the relicensing process, another 30-50 year permit<br />

is issued. Depending on the relicense process selected, there may be an opportunity for stakeholders<br />

to become involved during relicensing and have an impact on how the projects are operated and the<br />

mitigation and enhancement measures taken by the operator to achieve a new license. Considering<br />

flood control in <strong>WRIA</strong> <strong>62</strong>, the most important FERC licensed dams are Box Canyon Dam and<br />

Boundary Dam.<br />

4.1.4.1.2.1 Box Canyon Dam<br />

Box Canyon Dam (FERC project 2042) is located at RM 34.4, 2.5 miles north <strong>of</strong> the town <strong>of</strong> Ione.<br />

Box Canyon Dam is owned and operated by the Pend Oreille Public Utility District (PUD) No. 1 and<br />

has been licensed by FERC since 1952. Box Canyon is being operated on annual licenses since<br />

expiration <strong>of</strong> the original FERC license in February 2002. The PUD is currently working towards a<br />

long term FERC license.<br />

With very little active storage capacity (about 60,000 AF), Box Canyon is essentially a run-<strong>of</strong>-theriver<br />

project. The Box Canyon reservoir (and project) extends 56.6 miles along the Pend Oreille<br />

River to downstream <strong>of</strong> the Albeni Falls Dam during normal operations. According to its FERC<br />

license, Box Canyon Dam is operated with two mandatory constraints at Pend Oreille River flows <strong>of</strong><br />

less than about 90,000 cfs when the dam gates are in place and the dam has control <strong>of</strong> river<br />

elevations:<br />

1. Operations at Box Canyon will not result in greater than two feet <strong>of</strong> backwater at Albeni Falls<br />

Dam; and,<br />

2. Operations at Box Canyon will not result in an elevation greater than 2041 ft amsl at USGS<br />

Cusick gage at river mile 70.1.<br />

The first constraint is in place to minimize head loss at Albeni Falls Dam and the latter constraint is in<br />

place to minimize flooding in the town <strong>of</strong> Cusick and the Calispell Valley.<br />

In addition, the PUD has placed the following informal constraint on its operations that it expects to<br />

be included in its new long term license. The purpose <strong>of</strong> this constraint is to reduce the potential for<br />

river bank sloughing caused by rapid dewatering <strong>of</strong> the banks along the Box Canyon reservoir.<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong>