WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
March, 2005 -28- 023-1289-003.3040<br />
Management Action(s):<br />
H 2-1 Pend Oreille County Weed Board will develop and distribute public education<br />
materials (e.g., signs, leaflets, fliers, BMPs) to educate residents, developers and<br />
construction workers on how they can prevent the spread <strong>of</strong> noxious terrestrial<br />
weeds.<br />
H 2-2 The Pend Oreille County Weed Board will coordinate with interested landowners<br />
and managers to survey lands on a regular basis (at 4-year intervals) and use<br />
management tools (shovel, pulaski, backpack sprayer with herbicide) to remove<br />
small amounts <strong>of</strong> noxious weeds found at the time <strong>of</strong> the surveys.<br />
H 2-3 The Pend Oreille County Weed Board will develop management implementation<br />
plans (including prioritization <strong>of</strong> lands) with interested landowners for larger<br />
noxious weed populations.<br />
H 2-4 The Watershed Planning Implementing Body will assist the Pend Oreille County<br />
Weed Board to identify support (funding, in-kind and volunteer services) to help<br />
with implementation <strong>of</strong> the Pend Oreille County biocontrol program.<br />
3.3.3 H-3a<br />
Problem <strong>State</strong>ment: River bank erosion along the mainstem <strong>of</strong> the Pend Oreille River is resulting in<br />
degraded riparian habitat and water quality. The causes <strong>of</strong> erosion need to be confirmed and<br />
mitigated.<br />
Goal: To identify the causes <strong>of</strong> river bank erosion along the mainstem <strong>of</strong> the Pend Oreille River and<br />
work to minimize river bank erosion in the future.<br />
Statute Justification: RCW 90.82.090(2); RCW 90.82.110.<br />
Management Action(s):<br />
H 3a-1 Watershed Planning Implementing Body will develop a scope <strong>of</strong> work for a<br />
technical study to identify the causes <strong>of</strong> river bank erosion along the Pend Oreille<br />
River in <strong>WRIA</strong> <strong>62</strong>. The study will include review and prioritization <strong>of</strong> areas<br />
where there is concern and will identify mitigation / stabilization alternatives.<br />
H 3a-2 Watershed Planning Implementing Body will develop and implement a public<br />
education program to improve understanding <strong>of</strong> bank erosion along the mainstem<br />
<strong>of</strong> the Pend Oreille River.<br />
H 3a-3 Watershed Planning Implementing Body will compile reasonable bank<br />
stabilization strategies for landowners along the mainstem <strong>of</strong> the Pend Oreille<br />
River and provide education and assistance to landowners to implement these<br />
strategies (current Natural Resource Conservation Service (NRCS) specifications<br />
for bank stabilization are overwhelming to most landowners).<br />
H 3a-4 Watershed Planning Implementing Body will review shoreline plans and<br />
comprehensive plans for bank erosion mitigation strategies and will make<br />
<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong>