17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March, 2005 -28- 023-1289-003.3040<br />

Management Action(s):<br />

H 2-1 Pend Oreille County Weed Board will develop and distribute public education<br />

materials (e.g., signs, leaflets, fliers, BMPs) to educate residents, developers and<br />

construction workers on how they can prevent the spread <strong>of</strong> noxious terrestrial<br />

weeds.<br />

H 2-2 The Pend Oreille County Weed Board will coordinate with interested landowners<br />

and managers to survey lands on a regular basis (at 4-year intervals) and use<br />

management tools (shovel, pulaski, backpack sprayer with herbicide) to remove<br />

small amounts <strong>of</strong> noxious weeds found at the time <strong>of</strong> the surveys.<br />

H 2-3 The Pend Oreille County Weed Board will develop management implementation<br />

plans (including prioritization <strong>of</strong> lands) with interested landowners for larger<br />

noxious weed populations.<br />

H 2-4 The Watershed Planning Implementing Body will assist the Pend Oreille County<br />

Weed Board to identify support (funding, in-kind and volunteer services) to help<br />

with implementation <strong>of</strong> the Pend Oreille County biocontrol program.<br />

3.3.3 H-3a<br />

Problem <strong>State</strong>ment: River bank erosion along the mainstem <strong>of</strong> the Pend Oreille River is resulting in<br />

degraded riparian habitat and water quality. The causes <strong>of</strong> erosion need to be confirmed and<br />

mitigated.<br />

Goal: To identify the causes <strong>of</strong> river bank erosion along the mainstem <strong>of</strong> the Pend Oreille River and<br />

work to minimize river bank erosion in the future.<br />

Statute Justification: RCW 90.82.090(2); RCW 90.82.110.<br />

Management Action(s):<br />

H 3a-1 Watershed Planning Implementing Body will develop a scope <strong>of</strong> work for a<br />

technical study to identify the causes <strong>of</strong> river bank erosion along the Pend Oreille<br />

River in <strong>WRIA</strong> <strong>62</strong>. The study will include review and prioritization <strong>of</strong> areas<br />

where there is concern and will identify mitigation / stabilization alternatives.<br />

H 3a-2 Watershed Planning Implementing Body will develop and implement a public<br />

education program to improve understanding <strong>of</strong> bank erosion along the mainstem<br />

<strong>of</strong> the Pend Oreille River.<br />

H 3a-3 Watershed Planning Implementing Body will compile reasonable bank<br />

stabilization strategies for landowners along the mainstem <strong>of</strong> the Pend Oreille<br />

River and provide education and assistance to landowners to implement these<br />

strategies (current Natural Resource Conservation Service (NRCS) specifications<br />

for bank stabilization are overwhelming to most landowners).<br />

H 3a-4 Watershed Planning Implementing Body will review shoreline plans and<br />

comprehensive plans for bank erosion mitigation strategies and will make<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!