WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
March, 2005 TABLE 3-5<br />
CODE ISSUE / ACTION<br />
Growth and Landuse Planning - Issues, Actions and Responsible Parties<br />
GR&LU3: Road building and improper maintenance can negatively impact water quality and aquatic habitat.<br />
Support on-going and future programs / multiple entity projects on lands in <strong>WRIA</strong> <strong>62</strong> to identify and address road<br />
GR&LU3-1<br />
maintenance problems.<br />
GR&LU3-2<br />
GR&LU3-3<br />
GR&LU3-4<br />
Research and follow the pilot study that <strong>Ecology</strong> is working on with WDOT and WDFW, currently referred to as<br />
the Transportation Permit Efficiency and Accountability Committee (TPEAC). If this approach appears<br />
appropriate, work with <strong>Ecology</strong> to apply this process to <strong>State</strong> and County roads in <strong>WRIA</strong> <strong>62</strong>.<br />
Obtain assistance and guidance as needed from technical agencies (<strong>Ecology</strong>, WDOT, DNR, WDFW, Pend Oreille<br />
County) to minimize impacts <strong>of</strong> road building and improper maintenance in <strong>WRIA</strong> <strong>62</strong>.<br />
Recommend <strong>Ecology</strong> provide additional on-the-ground support to ensure BMPs (for road building and<br />
maintenance) are being implemented in <strong>WRIA</strong> <strong>62</strong> for projects less than 5 acres. This would involve <strong>Ecology</strong> staff<br />
involvement at the planning and implementation stages <strong>of</strong> a road building / maintenance project.<br />
023-1289-003.3040<br />
Page 3 <strong>of</strong> 3<br />
OBLIGATED OR<br />
RESPONSIBLE ENTITY JUSTIFYING STATUTE(S)<br />
RCW 90.82.005; RCW<br />
90.82.090(2)&(7); RCW<br />
90.82.110; RCW 90.82.120(3).<br />
Implementing body<br />
Implementing body, <strong>Ecology</strong>,<br />
WDOT, WDFW<br />
Implementing body, <strong>Ecology</strong>,<br />
WDOT, DNR, WDFW, Pend<br />
Oreille County<br />
<strong>Ecology</strong><br />
GR&LU3-5 Become involved in revisions to the Colville National Forest Plan. Implementing body<br />
GR&LU4: The Pend Oreille County Shoreline Master Program needs to be updated.<br />
GR&LU4-1<br />
Recommend that Pend Oreille County, with assistance from the Watershed Planning Implementing Body, apply<br />
for funding from <strong>Ecology</strong> and other outside sources to update the Pend Oreille County Shoreline Master Program<br />
prior to the 2012 <strong>Ecology</strong> deadline.<br />
Pend Oreille County,<br />
Implementing body<br />
RCW 90.82.005; RCW<br />
90.82.120(1)&(2).<br />
Golder Associates Tb 3-1 to 3-7 <strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> Responsible Parties