17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

March, 2005 -17- 023-1289-003.3040<br />

3.1.3 QUANT 2b<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong><br />

downloading the seven dataloggers at the stream gages that were installed in the<br />

Calispell, Davis, Skookum and Kent sub-basins during the Phase II assessment.<br />

Problem <strong>State</strong>ment: There is a need to ensure that the Watershed Planning Implementing Body is<br />

involved in instream flow studies, study recommendations and any instream flow rule -making in<br />

<strong>WRIA</strong> <strong>62</strong>.<br />

Goal: To ensure that the Watershed Planning Implementing Body is involved in any processes in<br />

<strong>WRIA</strong> <strong>62</strong> to conduct minimum instream flow studies and that the Watershed Planning Implementing<br />

Body is involved in recommendations and rule-making resulting from minimum instream flow<br />

studies in <strong>WRIA</strong> <strong>62</strong>.<br />

Note: The Watershed Planning Unit agreed by consensus to address instream flow setting in the<br />

five sub-basins anticipated to experience the greatest population growth (i.e. the Calispell, Davis,<br />

Skookum, Kent and McCloud sub-basins) as a priority before considering other sub-basins in<br />

<strong>WRIA</strong> <strong>62</strong>.<br />

Statute Justification: RCW 90.82.010; RCW 90.82.040 Notes: Finding-Intent-2001 c237; RCW<br />

90.82.070(1)(b),(e),(g)&(2); RCW 90.82.080.<br />

Management Action(s):<br />

QUANT2b-1 Obligate <strong>Ecology</strong> and WDFW to provide technical assistance to the<br />

Implementing Body during Phase IV <strong>of</strong> Watershed Planning to complete Step A<br />

(Scope <strong>of</strong> Work), Step B (Instream Flow Assessment - field work, analysis and<br />

reporting) and Step C (Negotiation <strong>of</strong> instream flows in a collaborative manner)<br />

for instream flows in <strong>WRIA</strong> <strong>62</strong> (following the collaborative manner described in<br />

RCW 90.82.080).<br />

Note:<br />

<strong>Ecology</strong> will not be obligated to provide technical assistance that involves<br />

actual field work, analysis or reporting. <strong>Ecology</strong> does agree to be obligated to<br />

provide technical assistance with the review <strong>of</strong> documents (scopes <strong>of</strong> work,<br />

analyses, reports etc.) as well as to collaborate with the Implementing Body<br />

during the negotiation <strong>of</strong> flow recommendations. <strong>Ecology</strong> also clarified that it<br />

cannot take on the obligation to involve the <strong>WRIA</strong> <strong>62</strong> planning entity in<br />

instream flow studies that may occur after Phase IV Imple mentation. It will be<br />

the responsibility <strong>of</strong> the Watershed Planning Implementing Body to make<br />

recommendations to <strong>Ecology</strong> at the end <strong>of</strong> the Phase IV if this situation is<br />

anticipated.<br />

WDFW agree to be obligated to provide technical assistance to the Watershed<br />

Planning Implementing Body for Steps A, B and C as priorities, funding and<br />

staff resources allow.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!