WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
WRIA 62 WMP 032305 - Washington State Department of Ecology
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
March, 2005 -108- 023-1289-003.3040<br />
<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong><br />
5. After minimum instream flow rule making for the Pend Oreille<br />
River mainstem, the Watershed Planning Unit recommends that<br />
<strong>Ecology</strong> consider petitioning the <strong>Washington</strong> <strong>State</strong> Governor to<br />
write a letter to Congress to raise the minimum discharge from<br />
Albeni Falls Dam from 4,000 cfs to be equivalent to the minimum<br />
instream flow rule.<br />
QUANT-3: Flood control.<br />
<strong>State</strong> SEPA,<br />
Collaboration<br />
Management Action SEPA Analysis<br />
1. The Watershed Planning Implementing Body will voice concerns<br />
regarding the impacts <strong>of</strong> flooding in Pend Oreille County and work<br />
with groups that influence the Pend Oreille River flow rates and water<br />
levels. These groups may include but are not limited to the Army<br />
Corps <strong>of</strong> Engineers, Northwest Power and Conservation Council,<br />
Bonneville Power Administration, Bureau <strong>of</strong> Reclamation, Seattle<br />
City Light, Pend Oreille Public Utility District, North Idaho Lakes<br />
Commission, <strong>Washington</strong> <strong>Department</strong> <strong>of</strong> Fish and Wildlife, Idaho<br />
Fish & Game, Pend Oreille County Diking Districts Nos. 1, 2 and 3<br />
and the Federal Emergency Management Agency (FEMA)..<br />
2. The Watershed Planning Implementing Body will voice concerns<br />
regarding the impacts <strong>of</strong> flooding in Pend Oreille County to<br />
<strong>Washington</strong>’s representative on the Technical Management Team<br />
(TMT) that addresses Columbia River dam and reservoir operations.<br />
3. Watershed Planning Implementing Body will identify what changes<br />
to project operations could be implemented to improve conditions<br />
regarding flooding in Pend Oreille County.<br />
Collaboration,<br />
Public Education<br />
Collaboration,<br />
Public Education<br />
Collaboration,<br />
Study