17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March, 2005 -107- 023-1289-003.3040<br />

QUANT-2b: There is a need to ensure that the Watershed Planning Implementing Body is<br />

involved in instream flow studies, study recommendations and any instream flow rule -making<br />

in <strong>WRIA</strong> <strong>62</strong>.<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong><br />

Management Action SEPA Analysis<br />

1. Obligate <strong>Ecology</strong> and WDFW to provide technical assistance to<br />

the Implementing Body during Phase IV Watershed Planning to<br />

complete Step A (Scope <strong>of</strong> Work), Step B (Instream Flow<br />

Assessment - field work, analysis and reporting) and Step C<br />

(Negotiation <strong>of</strong> instream flows in a collaborative manner) for<br />

instream flows in <strong>WRIA</strong> <strong>62</strong> (following the collaborative manner<br />

described in RCW 90.82.080).<br />

Note:<br />

<strong>Ecology</strong> will not be obligated to provide technical assistance<br />

that involves actual field work, analysis or reporting. <strong>Ecology</strong><br />

does agree to be obligated to provide technical assistance with<br />

the review <strong>of</strong> documents (scopes <strong>of</strong> work, analyses, reports etc.)<br />

as well as to collaborate with the Implementing Body during the<br />

negotiation <strong>of</strong> flow recommendations. <strong>Ecology</strong> also clarified<br />

that it cannot take on the obligation to involve the <strong>WRIA</strong> <strong>62</strong><br />

planning entity in instream flow studies that may occur after<br />

Phase IV Implementation. It will be the responsibility <strong>of</strong> the<br />

Watershed Planning Implementing Body to make<br />

recommendations to <strong>Ecology</strong> at the end <strong>of</strong> the Phase IV if this<br />

situation is anticipated.<br />

WDFW agree to be obligated to provide technical assistance to<br />

the Watershed Planning Implementing Body for Steps A, B and<br />

C as priorities, funding and staff resources allow.<br />

2. Recommend that the Legislature provide <strong>Ecology</strong> with additional<br />

funds for instream flow work for the Watershed Planning<br />

Implementing Body to use to complete instream flow studies in<br />

the collaborative manner described in RCW 90.82.080 during<br />

Phase IV Watershed Planning.<br />

3. The Watershed Planning Implementing Body will pursue funding<br />

to supplement implementation funds and will conduct instream<br />

flow studies in <strong>WRIA</strong> <strong>62</strong> at locations prioritized by the<br />

Watershed Planning Implementing Body with technical assistance<br />

from agencies (e.g., <strong>Ecology</strong>, WDFW) and qualified consultants.<br />

4. Recommend that <strong>Ecology</strong> to involve the Implementing Body with<br />

scoping instream flow studies if <strong>Ecology</strong> starts instream flow<br />

work in <strong>WRIA</strong> <strong>62</strong> during Phase IV Watershed Planning. If<br />

<strong>Ecology</strong> starts instream flow work in <strong>WRIA</strong> <strong>62</strong> after Phase IV,<br />

recommend that <strong>Ecology</strong> involve the <strong>WRIA</strong> <strong>62</strong> watershed<br />

planning entity if it is still in place.<br />

<strong>State</strong> SEPA,<br />

Study, (WP 26)<br />

<strong>State</strong> SEPA,<br />

Study, (WP 26)<br />

<strong>State</strong> SEPA,<br />

Study, (WP 26)<br />

<strong>State</strong> SEPA,<br />

Study, (WP 26)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!