17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March, 2005 -66- 023-1289-003.3040<br />

Strategy WQUAL 5-4 recommends that the Water Planning Implementing Body implement the water<br />

quality monitoring plan developed in the Phase II, Level 2 Technical Assessment (Golder, 2005).<br />

This plan was developed to address issues raised by the entities collecting water quality data in <strong>WRIA</strong><br />

<strong>62</strong> and issues raised in previous programs and reports.<br />

The recommended water quality monitoring actions listed in the Phase II, Level 2 Technical<br />

Assessment (Golder, 2005) are:<br />

1. Coordinate TMDL development and implementation in WA and ID.<br />

2. Conduct biological and baseline monitoring in sub-basins that drain into Idaho.<br />

3. Conduct temperature studies on the Pend Oreille River between Box Canyon and Canada.<br />

4. Develop water quality datasets that are comparable between <strong>WRIA</strong> <strong>62</strong> waterbodies.<br />

5. Conduct water quality monitoring in sub-basins where population growth is predicted.<br />

6. Develop and implement a stormwater monitoring program for urban areas (Metaline,<br />

Metaline Falls, Ione, Cusick and Newport).<br />

7. Upgrade <strong>Ecology</strong>’s Metaline Falls site to a Core Monitoring Location.<br />

8. Increase use <strong>of</strong> coordinated and comparable biological monitoring.<br />

9. Require use <strong>of</strong> water quality monitoring plans, QAPPs and comparable protocols<br />

10. Develop a <strong>WRIA</strong> <strong>62</strong> Data Management System.<br />

11. Install freeze protection on automated equipment in <strong>WRIA</strong> <strong>62</strong> tributaries.<br />

Justification for these recommendations are provided in Appendix F <strong>of</strong> the Phase II, Level 2 report<br />

(Golder, 2005). It is recommended that the Watershed Planning Implementing Body implement these<br />

recommendations contingent upon available funding and considering activities that have occurred<br />

since this work was completed.<br />

Strategy WQUAL 5-5 recommends that Pend Oreille County consider any ordinances that may help<br />

to reduce the impacts <strong>of</strong> population growth on water quality. These ordinances may include<br />

landscaping, stormwater, wetland and shoreline ordinances and could result in inclusion <strong>of</strong> wellhead<br />

protection areas in critical areas ordinance.<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!