17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March, 2005 TABLE 3-5<br />

CODE ISSUE / ACTION<br />

GR&LU1-1<br />

Growth and Landuse Planning - Issues, Actions and Responsible Parties<br />

GR&LU1: There is a need to integrate information on current and projected water supply and demand with land use.<br />

GR&LU1-2<br />

Watershed Planning Implementing Body to become involved with the County Planning Commission and<br />

comprehensive planning processes.<br />

Assess available water supply in the areas expected to experience the most population growth (i.e. the Calispell,<br />

Davis, Skookum, Kent and McCloud sub-basins). Note that improved understanding <strong>of</strong> streamflows in <strong>WRIA</strong> <strong>62</strong><br />

is needed to determine water availability within these sub-basins.<br />

GR&LU1-3 Assist Pend Oreille County in addressing Critical Areas Ordinance and updating the shorelines master program. Implementing body<br />

GR&LU1-4<br />

GR&LU1-5<br />

GR&LU1-6<br />

GR&LU1-7<br />

Integrate findings from the Phase II technical assessments and water needs assessment (see GR&LU 1-2) into local<br />

water system plans and county, city and town land use plans and shoreline master programs.<br />

Consider water supply information when updating land use designations to ensure consistency between the<br />

Comprehensive Plan land use designations and the <strong>WRIA</strong> <strong>62</strong> Watershed Management Plan technical findings and<br />

recommendations.<br />

Require pro<strong>of</strong> <strong>of</strong> water availability from the applicant prior to amending Urban Growth Area (UGA) boundaries.<br />

The proposal for expansion should include documentation <strong>of</strong> the ability <strong>of</strong> the city / town / development (if it is to<br />

be self-served) to provide adequate water. Burden <strong>of</strong> pro<strong>of</strong> is on the applicant. Domestic wells <strong>of</strong> 5,000 gallons<br />

per day or less serving one household are not included in this burden <strong>of</strong> pro<strong>of</strong>.<br />

Coordinate sub-basin specific water supply needs with alternative water supply options including reuse,<br />

reclamation, and conservation (e.g., development <strong>of</strong> a regional water supply using water withdrawn from the Pend<br />

Oreille River and treated).<br />

023-1289-003.3040<br />

Page 1 <strong>of</strong> 3<br />

OBLIGATED OR<br />

RESPONSIBLE ENTITY JUSTIFYING STATUTE(S)<br />

RCW 90.82.005; RCW<br />

90.82.010; RCW 90.82.030(1);<br />

RCW 90.82.040 Notes: Findings-<br />

Implementing body<br />

2003 1st sp.s.c 4; RCW<br />

90.82.040 Notes: Finding-Intent-<br />

2001 c 237; RCW 90.82.048(3);<br />

Implementing body<br />

RCW 90.82.070(2).<br />

Implementing body, Pend Oreille<br />

County<br />

Pend Oreille County<br />

Pend Oreille County<br />

Implementing body<br />

Golder Associates Tb 3-1 to 3-7 <strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> Responsible Parties

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!