17.01.2013 Views

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

WRIA 62 WMP 032305 - Washington State Department of Ecology

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

March, 2005 -119- 023-1289-003.3040<br />

<strong>WRIA</strong> <strong>62</strong> <strong>WMP</strong> <strong>032305</strong><br />

TABLE 7-5<br />

SEPA Analysis for Growth and Land Use Actions<br />

GR&LU-1: There is a need to information on current and projected water supply and demand<br />

with land use.<br />

Management Action SEPA Analysis<br />

1. The Watershed Planning Unit recommends that a representative<br />

<strong>of</strong> the Watershed Planning Implementing Body be involved with<br />

the County Planning Commission and County comprehensive<br />

planning processes.<br />

2. The Watershed Planning Implementing Body will assess<br />

available water supply in the areas expected to experience the<br />

most population growth (i.e. the Calispell, Davis, Skookum, Kent<br />

and McCloud sub-basins). Note that improved understanding <strong>of</strong><br />

streamflows in <strong>WRIA</strong> <strong>62</strong> is needed to determine water<br />

availability within these sub-basins.<br />

3. The Watershed Planning Unit recommends that the Watershed<br />

Planning Implementing Body assist Pend Oreille County in<br />

addressing Critical Areas ordinance and updating the shorelines<br />

master program.<br />

4. The Watershed Planning Unit recommends that findings from the<br />

Phase II technical assessments and water needs assessment (see<br />

GR&LU 1-2 above) are integrated into local water system plans<br />

and county, city and town land use plans.<br />

5. The Watershed Planning Unit recommends that Pend Oreille<br />

County consider water supply information when updating land<br />

use designations to ensure consistency between the<br />

Comprehensive Plan land use designations and the <strong>WRIA</strong> <strong>62</strong><br />

Watershed Management Plan technical findings and<br />

recommendations.<br />

6. The Watershed Planning Unit recommends that Pend Oreille<br />

County require pro<strong>of</strong> <strong>of</strong> water availability from the applicant<br />

prior to amending Urban Growth Area (UGA) boundaries. The<br />

proposal for expansion should include documentation <strong>of</strong> the<br />

ability <strong>of</strong> the city / town / development (if it is to be self-served)<br />

to provide adequate water. Burden <strong>of</strong> pro<strong>of</strong> is on the applicant.<br />

Domestic wells <strong>of</strong> 5,000 gallons per day or less serving one<br />

household are not included in this burden <strong>of</strong> pro<strong>of</strong>.<br />

7. The Watershed Planning Implementing Body will coordinate subbasin<br />

specific needs with alternative water supply options<br />

including reuse, reclamation, and conservation (e.g., development<br />

<strong>of</strong> a regional water supply using water withdrawn from the Pend<br />

Oreille River and treated).<br />

Other SEPA<br />

Other SEPA,<br />

Study<br />

Other SEPA<br />

WP 38, WP 40<br />

Other SEPA<br />

WP 38, WP 40<br />

Other SEPA<br />

Other SEPA<br />

Other SEPA

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!