4<br />

POWER-UP/COMMISSIONING<br />

4.2 - POWER-UP After the Soft-Starter has been prepared it can now be<br />

powered-up:<br />

1) Check the supply voltage:<br />

Measure the line voltage and check if it is within the<br />

permitted range (rated voltage + 10% / -15%).<br />

2) Power-up the input and switch on the control voltage:<br />

Close the input circuit breaker.<br />

3) Check if the power-up has been succesful:<br />

The HMI-3P display will show:<br />

Now the Soft-Starter will run some self-diagnosis routines and<br />

if there is no problem, the display will show:<br />

Parameter Content<br />

P72 (%IN)<br />

This means that the Soft-Starter is rdy=ready to be<br />

operated.<br />

4) Follow the commissioning procedures<br />

For combination drive "A" - Operation by HMI-3P - follow<br />

Item 4.3.2.<br />

For combination drive "B" - Operation by terminals -<br />

follow Item 4.3.3.<br />

For other configurations that require the change of<br />

several parameters (different standards), read first<br />

Chapter 6 - Detailed description of the parameters.<br />

4.3 - COMMISSIONING This Section describes the commissioning of the two<br />

characteristic combination drives describe above:<br />

Combination drive "A" - Operation through HMI-3P<br />

Combination drive "B" - Operation through Terminals<br />

43<br />