Flanagan, R., Lu, W., Shen, L. and Jewell, C.A. (2007)Competitiveness inconstruction: a critical review of research. Construction Management and Economics,25 (9). pp. 989-1000. ISSN 0144-6193 doi: 10.1080/01446190701258039Flanagan, R. (2007)The drivers and issues shaping the construction sector. In:Innovations in structural engineering and construction, Melbourne, Australia, pp. 3-13.Harty, C., Goodier, C., Soetanto, R., Austin, S., Dainty, A. and Price, A.D.F.(2007)The futures of construction: A critical review of construction futurestudies.Construction Management and Economics, 25 (5). pp. 477-493. ISSN 0144-6193 doi: 10.1080/01446190600879117Lindkvist, C. and Elmualim, A. (2010)Innovation in facilities management: fromtrajectories to ownership. Facilities, 28 (9/10). pp. 405-415. ISSN 0263-2772 doi:10.1108/02632771011057161Sexton, M. and Senaratne, S. (2008)Managing construction project change: aknowledge management perspective. Construction Management and Economics, 26(12). pp. 1303-1311. ISSN 0144-6193 doi: 10.1080/01446190802621044Wang, N., Ding, R., Radosavljevic, M. and Sun, H. (2011)Practicing sustainability inPFI project management. In: Technology Management Conference (ITMC), 2011IEEE International, 27-30 June 2011, Hilton San Jose, San Jose, CA, USA, pp. 717-722.Liste undersøkte publikasjoner Berkeley:Arbulu, R.J., Tommelein, I.D., Walsh, K.D., and Hershauer, J.C. (2003). "ValueStream Analysis of a Re-engineered Construction Supply Chain." J. BuildingResearch and Information - Special Issue on Re-engineering Construction, SponPress, 31 (2) 161–171.Ballard, G. and Tommelein, I.D. (2012). "Lean Management Methods for ComplexProjects." Engineering Project Organization Journal (TEPO), Taylor & Francis, 2:1-2, 85-96.Bea, R., I. Mitroff, D. Farber, H. Foster and K.H. Robert, "A New Approach to Risk:The Implications of E3," Journal of Risk Management, February 2009, Vol. 11, pp.30-43, doi: 10.1057/rm.2008.12.Chang, A.S. and C.W. Ibbs, "System Model for Analyzing Design Productivity,"Journal of Management in Engineering, ASCE, January 2006, Vol. 22, No. 1, pp. 27-34, doi: 10.106/(ASCE)0742-597X(2006)22:1(27) Choo, H.J., Hammond, J., Tommelein, I.D., Austin, S., and Ballard, G. (2004)."DePlan: Tool for Integrated Design Management." Automation in Construction, 13(3) 313-326, May.Gil, N., Beckman, S., and Tommelein, I. (2008). "Upstream Problem-Solving underUncertainty and Ambiguity: Evidence from Airport Expansion Projects," IEEETransactions on Engineering Management, 10.1109/TEM.2008.922635, publishedonline as of 10 June 2008Gil, N., Beckman, S., and Tommelein, I.D. (2008). "Problem-Solving Base Buildingunder Uncertainty and Ambiguity: A Multiple-Case Study on an Airport ExpansionProgram." ASCE, J. of Constr. Engrg. and Mgmt., CO/2006/023664, 134 (12) 991-1001 (December), available for download at ASCE.107
Gil, N., Tommelein, I.D., and Schruben, L.W. (2006). "External Change in LargeEngineering Design Projects: The Role of the Client." IEEE Transactions onEngineering Management, 53 (3) 426-439, August.Gil, N., Tommelein, I.D., and Beckman, S. (2004). "Postponing Design Processes inUnpredictable Environments." Research in Engineering Design, 15 (3) 139-154,December.Ibbs, W., L.D. Nguyen and S. Lee, "Quantified Impacts of Project Change," Journal ofProfessional Issues in Engineering Education and Practice, January 2007, Vol. 133,No. 1, pp. 45-52, doi: 10.1061/(ASCE)1052-3928(2007)133:1(45).Lee, E-B., H. Lee and C.W. Ibbs, "Productivity Aspects of Urban FreewayRehabilitation with Accelerated Construction," Journal of Construction Engineeringand Management, ASCE, October 2007, Vol. 133, No. 10, pp. 798-806, doi:10.1061/(ASCE)0733-9364(2007)133:10(798).Lee, H.W., Tommelein, I.D., and Ballard, G. (2012). "Design of a design-buildinfrastructure project using a point-based methodology." ASCE, Journal ofManagement in Engineering, 28 (3) 291-299, available for download athttp://ascelibrary.org/doi/pdf/10.1061/(ASCE)ME.1943-5479.0000103.Ling, F.Y.Y., C.W. Ibbs and E.W. Chew, "Strategies Adopted by InternationalArchitecture, Engineering, and Construction Firms in Southeast Asia," Journal ofProfessional Issues in Engineering Education and Practice, July 2008, Vol. 134, No.3, pp. 248-256, doi: 10.1061/(ASCE)1052-3928(2008)134:3(248).Ling, F.Y.Y., C.W. Ibbs and W.Y. Hoo, "Determinants of International Architectural,Engineering, and Construction Firms - Project Success in China," Journal ofConstruction Engineering and Management, ASCE, February 2006, Vol. 132, No. 2,pp. 206-214, doi: 10.1061/(ASCE)0733-9364(2006)132:2(206).Tsao, C.C.Y., Tommelein, I.D., Swanlund, E., and Howell, G.A. (2004). "WorkStructuring to Achieve Integrated Product-Process Design." ASCE, J. of Constr.Engrg. and Mgmt., Nov/Dec, 130 (6) 780-789.Vieira, P. and A. Horvath, "Assessing the End-of-Life Impacts of Buildings,"Environmental Science & Technology, July 2008, Vol. 42, No. 13, pp. 4663-4669, doi:10.1021/es0713451.Liste fra Derek H. T. Walker, redaktør for International Journal of Managing Projectsin Business RMIT UniversityAraujo, L., Dubois, A. and Gadde, L.-E. (1999). “Managing Interfaces withSuppliers.” Industrial Marketing Management. 28 (5): 497-506.Cox, A. (1999). “Power, Value and Supply Chain Management.” Supply ChainManagement. 4 (4): 167-175.Gil, N. (2009). “Developing Cooperative Project Client-Supplier Relationships: HOWMUCH TO EXPECT FROM RELATIONAL CONTRACTS?” CaliforniaManagement Review. 51 (2): 144-169.Maqsood, T., Walker, D. H. T. and Finegan, A. D. (2007). “Extending the“Knowledge Advantage”: Creating Learning Chains.” The Learning Organization. 14(2): 123-141.108
- Page 1 and 2:
Marit Støre Valen, Nils Olsson, An
- Page 3 and 4:
1. Sammendrag - beste praksis innen
- Page 5 and 6:
Økt trykk på standardisering av b
- Page 7 and 8:
dermed forstått oppdraget til ikke
- Page 9 and 10:
Analysen av beste praksis slik den
- Page 11 and 12:
3. FunnI lys av den metodiske tiln
- Page 13 and 14:
3.1. Constructing ExcellenceConstru
- Page 15 and 16:
Department of Trade and Industry (1
- Page 17 and 18:
Be Valuable - A Guide to Creating V
- Page 19 and 20:
o Ta lønnsspørsmål og arbeidsfor
- Page 21 and 22:
Never waste a good crisis - a revie
- Page 23 and 24:
3.2. University of Reading, School
- Page 25 and 26:
Fernie, S., Green, S. D., Weller, S
- Page 27 and 28:
I de siste fem årene har fokus væ
- Page 29 and 30:
Innovasjon oppnås ikke alene innen
- Page 31 and 32:
3.3. Berkeley UniversityBerkeley Un
- Page 33:
o Standardisering av prosesser fore
- Page 36 and 37:
KontraktEngineeringSamplesRessurser
- Page 38 and 39:
Moderate designutsettelser (i tid)
- Page 40 and 41:
er funnet til å være både avgjø
- Page 42 and 43:
Hva angår anskaffelsesstrategier b
- Page 44 and 45:
Vieira, P. and A. Horvath, "Assessi
- Page 46 and 47:
Disputes Prevention and ResolutionF
- Page 48 and 49:
SD-4 Constructability Improvement D
- Page 50 and 51:
SD-105 - Analysis of Pre-Project Pl
- Page 52 and 53:
trekker inn eier som endelig ansvar
- Page 54 and 55:
Funn fra søk:Araujo, L., Dubois, A
- Page 56 and 57:
Dersom personell ikke var vant med
- Page 58 and 59: Tre konklusjoner følger analysen:(
- Page 60 and 61: Figur 9: NTNUs primærinteressefelt
- Page 62 and 63: Referanser:“Effektvurdering av st
- Page 64 and 65: Side med omtale av lean-forskning,
- Page 66 and 67: Delmål for en FDV-organisasjonen k
- Page 68 and 69: 3.6.4. Anita Moum: Helhetlig komple
- Page 70 and 71: aktørene involvert i byggeprosjekt
- Page 72 and 73: Figur fra CIB White Paper on IDDS
- Page 74 and 75: SHOK (Strategic Centres for Science
- Page 76 and 77: 3.6.5. Ole Jonny Klakegg: Prosjekte
- Page 78 and 79: En hensiktsmessig prosjekteierstyri
- Page 80 and 81: usikkerhetsstyring er voksende. Utf
- Page 82 and 83: (SHAMPU-metoden): Shape, Harness an
- Page 84 and 85: Klakegg, Williams, Walker, Andersen
- Page 86 and 87: analysemetoder og indikatorer er ut
- Page 88 and 89: samfunnets krav. Standarden kan bru
- Page 90 and 91: Direkte påvirkning: Det finnes i d
- Page 92 and 93: En alternativ planleggingsmetode ba
- Page 94 and 95: Når det gjelder oppfølging i forh
- Page 96 and 97: 3.6.8. Ola Lædre: Kontraktuelle sp
- Page 98 and 99: Publikasjoner fra kontraktuelle sp
- Page 100 and 101: Liste over publikasjoner fra konfli
- Page 102 and 103: litteraturen å finne entydig forsk
- Page 104 and 105: Sluttbrukers og utførers kompetans
- Page 106 and 107: de retningene som forskningen etter
- Page 110 and 111: Vrijhoef, R. and Koskela, L. (2000)
- Page 112: og andre bransjer. Han har vært an