Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>2008</strong><br />
Department records and work centers contain information for the<br />
capacity calculation, capacity planning and scheduling. The exact<br />
capacity available per day is determined by means of capacity additions<br />
and deductions.<br />
In operations all data required for running a production step is<br />
administrated. The exact capacity requirement for the entered work center<br />
of the operation is specified for the product in the production list.<br />
Cost rates for the preliminary costing are entered in departments, work<br />
centers and operations as well.<br />
<strong>2008</strong><br />
25/140