The costings are always up-to-date and can be directly opened from the<br />
individual data objects, for example the customer sales order or the work<br />
order.<br />
This tool is especially helpful in make-to-order production, on the one<br />
hand to be able to display the current cost status and on the other hand<br />
to be able to include a projection with regard to the expected costs for an<br />
order, in the controlling, at an early stage. The determination of the<br />
inventory value of the WIP is automatically linked to the simultaneous<br />
costing.<br />
3.10.3. Final costing<br />
In abas ERP completed sales orders and work orders can be finally<br />
calculated. The final costings can be displayed in consolidated form or in<br />
detailed views.<br />
When final costing is carried out, all types of procurements will be finally<br />
calculated – both sales order related procurements and warehouse<br />
procurements. Final costing can also be carried out for filed processes<br />
and can be run simultaneously. Not yet incurred costs are determined<br />
from the sales order preliminary costing.<br />
Final costing is carried out using a cost collector which you can edit in<br />
order to enter and correct individual costs. When an individual final<br />
costing value has been entered, it will be taken into consideration by the<br />
final costing. Additionally, a row and possible additional costs that are<br />
initially unknown to the final costing can be included in the cost collector.<br />
Here you can enter, for example, travel or freight costs, which you<br />
already know will accrue but for which a document does not yet exist.<br />
They will be adopted into the final costing as special costs.<br />
In invoices and a financial entries costs can be allocated to several items,<br />
reservations or work order suggestions via a cost allocator.<br />
If the final costing collected all costs of a finished product, then the mixed<br />
price of the finished product will be updated. This happens when the<br />
respective work order suggestion is filed. This mixed price update is<br />
documented in the stock movement journal. As long as not all the costs<br />
of the work order suggestion are available and can be posted, the mixed<br />
price will not be updated. The update will be automatically carried out by<br />
final costing when all costs of the work order suggestion have been<br />
posted. If the final costing should update the mixed price or not can be<br />
determined via the field "Mixed price update" in the configuration data<br />
record.<br />