Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
3.12.10. Interfaces<br />
As a central function of the business software, financial accounting<br />
contains interfaces to:<br />
• Payroll accounting<br />
• DATEV Financial Accounting<br />
3.13. Cost accounting<br />
abas ERP supports the flexible standard costing – a cost accounting<br />
system which allows the adjustment of planned costs to all actual<br />
situations which have been modified compared to the original planning.<br />
It is thus possible to eliminate all variances, which can not be justified by<br />
the cost center manager, from the target/actual comparison.<br />
Cost accounting structure<br />
The sub-areas of the abas ERP cost accounting<br />
• Cost type accounting<br />
• Cost center accounting<br />
• Cost object accounting<br />
can be used individually (e.g. the cost type accounting) or together (e.g.<br />
cost type accounting and cost center accounting). A step by step build-up<br />
of the cost accounting is fast and easy in abas ERP.<br />
The cost accounting in abas ERP follows the principle of the integrated<br />
accounting system. With regard to the actual data, the data of the<br />
financial accounting is accessed. There is also a statistical journal in<br />
which only cost accounting entries can be made. With the abas ERP cost<br />
accounting solutions from the basic cost accounting up to the flexible<br />
standard costing can be represented.<br />
Examples:<br />
• Actual cost type accounting and actual cost center accounting limited<br />
to the primary costs ("cost accounting for newcomers").<br />
• Actual cost center accounting with internal account activity allocation.<br />
• Actual and planned cost center accounting with planned-actual<br />
comparison and internal account activity allocation.<br />
• Cost center accounting according to flexible standard costing with<br />
target-actual comparison.<br />
Cost accounting values<br />
In cost accounting it is possible to continuously use actual and planned<br />
values. There is also the option to run the cost accounting as a purely<br />
actual calculation or as an actual and planned calculation.<br />
98/140<br />
<strong>2008</strong><br />
<strong>2008</strong>