Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
Version 2008 - ABAS Software AG
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
76/140<br />
Overview of completion confirmations<br />
• Completion confirmations:<br />
- for parts<br />
- for assemblies<br />
- for individual work orders<br />
- for operations for which a completion confirmation has to be generated<br />
- with automatic stock adjustment<br />
· Receipt entry for parts<br />
· Withdrawal entry for material<br />
• Completion confirmations for operations:<br />
- with start and finish dates<br />
- with total times<br />
- without times<br />
- with yield<br />
- with scrap quantities and scrap types<br />
- with rework<br />
• Recording of excess and shortfall withdrawals<br />
• Recording of scrap and scrap types<br />
• Recording of rework quantities and rework types<br />
• Recording of unscheduled completion confirmations<br />
• Recording of overhead costs<br />
Completion confirmations via the production data capture PDC<br />
• PDC devices can be connected<br />
• Recording of order times<br />
3.8.8. PDC: Personnel time recording/<br />
Order time recording<br />
abas ERP contains an integrated administration of PDC data to facilitate<br />
the fast reflux of production completion confirmations. There is an<br />
interface for the transfer of data from external PDC devices.<br />
As a basis for the exact recording of personnel time and order time abas<br />
ERP provides definable shift schedules and daily schedules. Via interfaces<br />
to external personnel time recording systems and PDC systems working<br />
times, break periods and shifts are – correct to the second – transferred to<br />
abas ERP. There they can be utilized for capacity planning, financial<br />
accounting and for numerous statistical evaluations.<br />
<strong>2008</strong><br />
Overview of the recording of the personnel time / order time<br />
• Recording of personnel time<br />
• Recording of order time<br />
• Freely defined shift schedules and daily schedules<br />
• Automatic allocation of shifts<br />
• Automatic sales order end<br />
• Time data archive<br />
• Time recording via PDC devices and terminal possible<br />
• Interface to external personnel time recording systems<br />
Standard lists and evaluations<br />
• Attendance list and absence list<br />
• Time statement list, time stamp list<br />
• List of order times according to selectable criteria<br />
<strong>2008</strong>