Bottleneck analysis<br />
The abas ERP bottleneck analysis enables an analysis of the capacity<br />
utilization and particularly the problematic cases in production. All<br />
bottlenecks of the production facility are displayed for a chosen period of<br />
time. It is possible to analyze an identified bottleneck down to the last<br />
detail per drill-down.<br />
Movement of processes<br />
Besides the option to move complete work orders to other dates,<br />
individual processes or operations can also be moved. These movements<br />
are immediately taken into consideration by scheduling and the<br />
corresponding results are instantly available.<br />
Capacity planning deallocation<br />
The scheduled capacities are deallocated by the completion<br />
confirmations. Generally the times will be used as the capacity units. But<br />
quantity units, e.g. tons or meters, can also be used as capacity unit.<br />
Capacity changes<br />
The theoretically usable capacity, defined in the master files of a capacity<br />
group, which refers to specific time cycles, can be temporarily changed.<br />
Due to this, excess or shortfall capacities can be agreed for a specific<br />
period of time. These changes will be taken into consideration by the<br />
scheduling calculation and will be displayed in the results.<br />