Bottleneck analysis<br />

The abas ERP bottleneck analysis enables an analysis of the capacity<br />

utilization and particularly the problematic cases in production. All<br />

bottlenecks of the production facility are displayed for a chosen period of<br />

time. It is possible to analyze an identified bottleneck down to the last<br />

detail per drill-down.<br />

Movement of processes<br />

Besides the option to move complete work orders to other dates,<br />

individual processes or operations can also be moved. These movements<br />

are immediately taken into consideration by scheduling and the<br />

corresponding results are instantly available.<br />

Capacity planning deallocation<br />

The scheduled capacities are deallocated by the completion<br />

confirmations. Generally the times will be used as the capacity units. But<br />

quantity units, e.g. tons or meters, can also be used as capacity unit.<br />

Capacity changes<br />

The theoretically usable capacity, defined in the master files of a capacity<br />

group, which refers to specific time cycles, can be temporarily changed.<br />

Due to this, excess or shortfall capacities can be agreed for a specific<br />

period of time. These changes will be taken into consideration by the<br />

scheduling calculation and will be displayed in the results.<br />

74/140<br />