3.10.1. Preliminary costing<br />
Preliminary costing can be carried out on the basis of known parts master<br />
files structures. It is also possible to manually set the respective values of<br />
a preliminary costing as defaults without the system accessing existing<br />
structures.<br />
Carried out preliminary costings can be archived and are therefore<br />
available for costing comparisons.<br />
In abas Business <strong>Software</strong> it is possible to edit costing results which were<br />
generated by the individual preliminary costing. In the costing results<br />
costs can be edited, deleted and added. Each of these changes<br />
immediately has an effect on the total costing so that the consequences of<br />
these "What would happen if...?" - business games can be seen directly.<br />
Overview of preliminary costing functions<br />
• Preliminary costing for parts, assemblies, finished products<br />
• Preliminary costing for quotations<br />
• Preliminary costing for sales orders<br />
• Selectable valuation:<br />
- Mixed price, last cost price<br />
- Planned transfer price<br />
• Preliminary costing for partial costs and full costs<br />
• Weight calculations<br />
• Date calculation, delivery time<br />
• Consideration of quantity discount scales<br />
• Editing the costing results<br />
3.10.2. Simultaneous costing<br />
abas ERP provides the option to create simultaneous costings for<br />
customer sales orders within the scope of make-to-order production and<br />
for work orders. These are based on the posted completion confirmations<br />
of production (valuated times), the posted materials consumption, the<br />
special direct costs of production and the special direct costs of sales.<br />