17.06.2013 Views

FIFTH CANADIAN CONFERENCE ON NONDESTRUCTIVE ... - IAEA

FIFTH CANADIAN CONFERENCE ON NONDESTRUCTIVE ... - IAEA

FIFTH CANADIAN CONFERENCE ON NONDESTRUCTIVE ... - IAEA

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

- 34 -<br />

At the Bruce we have completed the rehabilitation of two reactors and are<br />

presently working on the third. The second unit was completed at about a<br />

quarter of the cost of the first. The garter spring repositioning<br />

program has been a high profile work assignment for quality control. In<br />

most cases, quality control inspections are the last task to take place<br />

in a long chain of production operations. By the time it gets to us,<br />

it's usually behind schedule and everyone is quite willing to point the<br />

finger at quality control for holding up production. This, however, has<br />

been one of the gratifying experiences where quality control was an<br />

integral part of the production process and as such played a positive<br />

role in achieving a rather remarkable goal.<br />

I would like to thank the following for the immeasurable help they have<br />

provided :<br />

- Ontario Hydro Central Nuclear Services for their help in getting us<br />

started.<br />

- AECL's Chalk River Nuclear Laboratories who did miracles in designing<br />

probes and automatic scanning equipment.<br />

- Hy staff of forty-four inspectors and supervisors who made the job look<br />

easy.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!