02.07.2013 Views

Electrical Power Systems

Electrical Power Systems

Electrical Power Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

\ i asy max =<br />

from which<br />

Synchronous Machine: Steady State and Transient Operations 93<br />

<br />

HG<br />

I<br />

Eo<br />

Xd¢¢<br />

KJ +<br />

<br />

HG<br />

max E<br />

iasy = o<br />

3<br />

Xd<br />

¢¢<br />

<br />

HG<br />

Eo<br />

2 ...(4.40)<br />

X ¢¢<br />

d<br />

I<br />

KJ<br />

2 2<br />

I<br />

KJ<br />

...(4.41)<br />

The momentary duty of a circuit breaker is given in terms of the asymmetrical short-circuit<br />

current.<br />

4.9 EECT O LOAD CURRENT<br />

If the fault occurs when the synchronous generator is delivering a perfault load current, two<br />

methods might be used in the solution of three-phase symmetrical fault currents.<br />

4.9.1 Use of Internal Voltages Behind Reactances<br />

When there is a prefault load current, three internal voltages E², E¢ and E may be considered<br />

to be during subtransient, transient and the steady state periods, respectively and these<br />

voltages are known as the voltage behind subtransient reactance, voltage behind transient<br />

reactance and voltage behind synchronous reactance. Consider the single line diagram of a<br />

loaded generator as given in ig. 4.12.<br />

ig. 4.12: (a) Single line diageram of a loaded generator (b) Phasor diagram.<br />

rom ig. 4.11(b), we can write<br />

E² = V + jX ² d IL E¢ = V + jX ¢ d IL E = V + jX d IL ...(4.42)<br />

4.9.2 Use of Thévenin’s Theorem and Superposition with Load Current<br />

An alternate method of computing short-circuit current is through use of Thévenin’s theorem<br />

and superposition of prefault load current. Here it is illustrated through an example.<br />

Consider a synchronous generator feeding a synchronous motor load, over a transmission<br />

line. igure 4.13 (a) shows the circuit model under steady load conditions. ault computations