02.07.2013 Views

Electrical Power Systems

Electrical Power Systems

Electrical Power Systems

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

350 <strong>Electrical</strong> <strong>Power</strong> <strong>Systems</strong><br />

In this case, it is also assumed that each DISCO demands 0.04 pu MW power from GENCOs<br />

as defined by cpfs in DPM matrix and each GENCO participates in AGC as defined by following:<br />

apfs: a11 ¢ = 0.75, a12 ¢ = 0.25; a21 ¢ = a22 ¢ = 0.50<br />

Note that ACE participation factors (apfs) affect only the transient behaviour of the<br />

system and not the steady-state behaviour when uncontracted loads are absent, i.e.,<br />

DPuc1 = DPuc2 = 0.0.<br />

The scheduled power flow on the tie-line in the direction from area-1 to area-2 is (eqn. 13.4):<br />

scheduled<br />

DP<br />

tie,1- 2 =<br />

2<br />

å<br />

i=1<br />

å<br />

j= 3<br />

4<br />

cpf DPL<br />

–<br />

ij j<br />

å<br />

i= 3<br />

4<br />

2<br />

å<br />

j=1<br />

cpf DPL<br />

ig. 13.6(a): D 1 (Hz) vs. time (sec).<br />

ig. 13.6(b): D 2 (Hz) vs. time (sec).<br />

ij j<br />

ig. 13.6(c): DP tiel2, actual (pu Mw) vs. time (sec).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!