- Page 1 and 2: ARMSTRONG CREEK URBAN GROWTH PLAN V
- Page 3 and 4: THE STRUCTURE OF THE URBAN GROWTH P
- Page 5 and 6: 3.2 Land Use Budget________________
- Page 7 and 8: 1 INTRODUCTION 1.1 THE GROWTH OF GE
- Page 9 and 10: Moorabool River Bannockburn Inverle
- Page 11: complement and add value to it to c
- Page 15 and 16: 1.5 THE STRUCTURE OF THIS REPORT Se
- Page 17 and 18: 2.2 OVERALL VISION STATEMENT The Ar
- Page 19 and 20: help attract high-technology busine
- Page 21 and 22: 3 FRAMEWORK PLAN 3.1 KEY STRUCTURIN
- Page 23 and 24: 3.2 LAND USE BUDGET The following t
- Page 25 and 26: 4 PLANNING AND DESIGN PRINCIPLES 4.
- Page 27 and 28: Drooping Sheoak - as for above spec
- Page 29 and 30: KEY CONCEPT: A GREEN SETTING The vi
- Page 31 and 32: o ensuring the extent of public ope
- Page 33 and 34: 4.2 4.2 FLOODING AND DRAINAGE This
- Page 35 and 36: Measures to achieve the above princ
- Page 37 and 38: KEY CONCEPT: WATER SENSITIVE URBAN
- Page 39 and 40: Armstrong Creek Urban Growth Plan F
- Page 41 and 42: prior to 1861, and Stewart’s Rese
- Page 43 and 44: o consider the strategic linkages b
- Page 45 and 46: Figure 4.3.2: Indicative and simpli
- Page 47 and 48: No. on Fig 4.3.3 No. Street Town/ S
- Page 49 and 50: No. on Fig 4.3.3 No. Street Town/ S
- Page 51 and 52: The trail and centre will be develo
- Page 53 and 54: EAST EAST EAST EAST EAST EAST EAST
- Page 55 and 56: 4.4 EMPLOYMENT This section should
- Page 57 and 58: 2. Regional innovation: the UGP sho
- Page 59 and 60: P 4.7 Development in the growth are
- Page 61 and 62: Western Industrial Precinct The Wes
- Page 63 and 64:
The development of specialised loca
- Page 65 and 66:
The activity centres—especially t
- Page 67 and 68:
4.5.2 KEY ISSUES Walkability Conviv
- Page 69 and 70:
educes car dependency and, therefor
- Page 71 and 72:
4.5.3 PRINCIPLES - RESIDENTIAL NEIG
- Page 73 and 74:
4.6 ACTIVITY CENTRES This section s
- Page 75 and 76:
4.6.2 KEY ISSUES Retail activity Th
- Page 77 and 78:
P 6.3 A mixed-use corridor should b
- Page 79 and 80:
4.6.4 ACTIVITY CENTRE STRUCTURE The
- Page 81 and 82:
Central part of Armstrong Creek cat
- Page 83 and 84:
contain a 3.5ha primary school that
- Page 85 and 86:
All the smaller centres should be l
- Page 87 and 88:
provides locations where unforeseen
- Page 89 and 90:
greater levels of investment in lin
- Page 91 and 92:
4.7.3 PRINCIPLES - OPEN SPACE AND R
- Page 93 and 94:
4.7.4 SUMMARY The following table s
- Page 95 and 96:
Therefore, it is critical that the
- Page 97 and 98:
The primary purpose of the “east-
- Page 99 and 100:
4.8.3 PRINCIPLES - MOVEMENT AND ACC
- Page 101 and 102:
P 8.13 Provision should be made for
- Page 103 and 104:
KEY CONCEPT: PUBLIC TRANSPORT In a
- Page 105 and 106:
4.8.8 PEDESTRIAN AND CYCLE ROUTES D
- Page 107 and 108:
Figure 4.8.2 Possible cross-section
- Page 109 and 110:
nature strips are minimised. Wider
- Page 111 and 112:
oad will be a limited access road w
- Page 113 and 114:
Water Supply Barwon Water is curren
- Page 115 and 116:
northern side of the 220kV line, an
- Page 117 and 118:
Telecommunications Telstra advises
- Page 119 and 120:
P 9.3 A comprehensive sustainable w
- Page 121 and 122:
5 NON URBAN AREAS 5.1 INTRODUCTION
- Page 123 and 124:
There is also an aeolian sand dune
- Page 125 and 126:
Interface issue Potential problem C
- Page 127 and 128:
6 SURROUNDING AREAS 6.1 INTRODUCTIO
- Page 129 and 130:
7 PRECINCT STRUCTURE PLANS Council
- Page 131 and 132:
sewerage to Black Rock and associat