- Page 1 and 2:
ARMSTRONG CREEK URBAN GROWTH PLAN V
- Page 3 and 4:
THE STRUCTURE OF THE URBAN GROWTH P
- Page 5 and 6:
3.2 Land Use Budget________________
- Page 7 and 8:
1 INTRODUCTION 1.1 THE GROWTH OF GE
- Page 9 and 10:
Moorabool River Bannockburn Inverle
- Page 11 and 12:
complement and add value to it to c
- Page 13 and 14:
Process The UGP was developed in fi
- Page 15 and 16:
1.5 THE STRUCTURE OF THIS REPORT Se
- Page 17 and 18:
2.2 OVERALL VISION STATEMENT The Ar
- Page 19 and 20:
help attract high-technology busine
- Page 21 and 22:
3 FRAMEWORK PLAN 3.1 KEY STRUCTURIN
- Page 23 and 24:
3.2 LAND USE BUDGET The following t
- Page 25 and 26:
4 PLANNING AND DESIGN PRINCIPLES 4.
- Page 27 and 28:
Drooping Sheoak - as for above spec
- Page 29 and 30:
KEY CONCEPT: A GREEN SETTING The vi
- Page 31 and 32:
o ensuring the extent of public ope
- Page 33 and 34:
4.2 4.2 FLOODING AND DRAINAGE This
- Page 35 and 36:
Measures to achieve the above princ
- Page 37 and 38:
KEY CONCEPT: WATER SENSITIVE URBAN
- Page 39 and 40:
Armstrong Creek Urban Growth Plan F
- Page 41 and 42:
prior to 1861, and Stewart’s Rese
- Page 43 and 44:
o consider the strategic linkages b
- Page 45 and 46:
Figure 4.3.2: Indicative and simpli
- Page 47 and 48:
No. on Fig 4.3.3 No. Street Town/ S
- Page 49 and 50:
No. on Fig 4.3.3 No. Street Town/ S
- Page 51 and 52:
The trail and centre will be develo
- Page 53 and 54:
EAST EAST EAST EAST EAST EAST EAST
- Page 55 and 56:
4.4 EMPLOYMENT This section should
- Page 57 and 58:
2. Regional innovation: the UGP sho
- Page 59 and 60:
P 4.7 Development in the growth are
- Page 61 and 62:
Western Industrial Precinct The Wes
- Page 63 and 64:
The development of specialised loca
- Page 65 and 66:
The activity centres—especially t
- Page 67 and 68:
4.5.2 KEY ISSUES Walkability Conviv
- Page 69 and 70:
educes car dependency and, therefor
- Page 71 and 72:
4.5.3 PRINCIPLES - RESIDENTIAL NEIG
- Page 73 and 74:
4.6 ACTIVITY CENTRES This section s
- Page 75 and 76:
4.6.2 KEY ISSUES Retail activity Th
- Page 77 and 78:
P 6.3 A mixed-use corridor should b
- Page 79 and 80:
4.6.4 ACTIVITY CENTRE STRUCTURE The
- Page 81 and 82: Central part of Armstrong Creek cat
- Page 83 and 84: contain a 3.5ha primary school that
- Page 85 and 86: All the smaller centres should be l
- Page 87 and 88: provides locations where unforeseen
- Page 89 and 90: greater levels of investment in lin
- Page 91 and 92: 4.7.3 PRINCIPLES - OPEN SPACE AND R
- Page 93 and 94: 4.7.4 SUMMARY The following table s
- Page 95 and 96: Therefore, it is critical that the
- Page 97 and 98: The primary purpose of the “east-
- Page 99 and 100: 4.8.3 PRINCIPLES - MOVEMENT AND ACC
- Page 101 and 102: P 8.13 Provision should be made for
- Page 103 and 104: KEY CONCEPT: PUBLIC TRANSPORT In a
- Page 105 and 106: 4.8.8 PEDESTRIAN AND CYCLE ROUTES D
- Page 107 and 108: Figure 4.8.2 Possible cross-section
- Page 109 and 110: nature strips are minimised. Wider
- Page 111 and 112: oad will be a limited access road w
- Page 113 and 114: Water Supply Barwon Water is curren
- Page 115 and 116: northern side of the 220kV line, an
- Page 117 and 118: Telecommunications Telstra advises
- Page 119 and 120: P 9.3 A comprehensive sustainable w
- Page 121 and 122: 5 NON URBAN AREAS 5.1 INTRODUCTION
- Page 123 and 124: There is also an aeolian sand dune
- Page 125 and 126: Interface issue Potential problem C
- Page 127 and 128: 6 SURROUNDING AREAS 6.1 INTRODUCTIO
- Page 129 and 130: 7 PRECINCT STRUCTURE PLANS Council
- Page 131: sewerage to Black Rock and associat