EMERGENCY PROCEDURES MANUAL - Department of Health
EMERGENCY PROCEDURES MANUAL - Department of Health
EMERGENCY PROCEDURES MANUAL - Department of Health
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Respond Yellow<br />
ENGINEERING STAFF<br />
AFTER NOTIFICATION OF LIFT BREAKDOWN:<br />
Proceed directly to the affected lift.<br />
Ascertain what steps are necessary to rectify problem and check if anyone is trapped.<br />
If fault cannot be rectified:<br />
Contact the lift service company and arrange for immediate attention (state the<br />
urgency <strong>of</strong> problem, i.e. person(s) trapped or not).<br />
If persons are trapped:<br />
Contact the Emergency Co-ordinator (via Switch ext 2444)<br />
Liaise nursing/medical staff to ensure patient needs are addressed.<br />
Ensure that the Manager F.E.M. and Risk Management have been informed.<br />
MANAGER F.E.M.<br />
AFTER NOTIFICATION OF LIFT BREAKDOWN<br />
Ensure all relevant actions are being taken to quickly rectify problem.<br />
Document all problems encountered.<br />
Immediately arrange for the nominated nursing staff member to contact the trapped<br />
person(s) in the affected lift.<br />
Ascertain if persons in lift are in distress.<br />
Inform occupants what positive steps are being taken.<br />
Reassure occupants.<br />
Arrange for medical assistance if necessary.<br />
Liaise and co-ordinate with the Emergency Engineering staff.<br />
The incident should be recorded and the incident/hazard/near miss report submitted<br />
to Risk Management.<br />
June 2001 Page 20 <strong>of</strong> 22