23.02.2014 Views

Rack Palette - Operators Manual - Strand Lighting

Rack Palette - Operators Manual - Strand Lighting

Rack Palette - Operators Manual - Strand Lighting

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Tools<br />

The Advance Time establishes the length of time a Channel stays at the<br />

High Check Value before automatically fading down to the low check<br />

value. At the same time the next Channel fades up to the High Check<br />

level, and so on.<br />

3. Click Stop if you want to pause on a Channel.<br />

4. Press either the Go Forward or Go Back button to continue in the desired direction.<br />

5. Select OK or press Enter when your done.<br />

Note:<br />

• The High Check Value can be lower than the Low Check Value.<br />

• There are macro in the Macro Editor that will advance or backup the<br />

Channel check. If you assign these macros to the console's trigger<br />

buttons, you can easily make a pendant that you can use on stage for<br />

doing Channel check.<br />

• The last Tool you used is assigned to the [TOOLS] button. If you<br />

select a Channel before you enter Channel Check, that is the Channel<br />

that the Channel Check will start at. So, when used in combination<br />

with the last Tool button, the syntax becomes [#] [TOOLS].<br />

<strong>Palette</strong> OS Operations <strong>Manual</strong> 228

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!