23.06.2014 Views

5. Commands and Functions - Sanyo Denki America, Inc.

5. Commands and Functions - Sanyo Denki America, Inc.

5. Commands and Functions - Sanyo Denki America, Inc.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>5.</strong> <strong>Comm<strong>and</strong>s</strong> <strong>and</strong> <strong>Functions</strong><br />

3) SDN + C-phase detection mode: Type 2<br />

After detecting the edge of the SDN signal connected to Pin 9 of CN1, movement starts in the<br />

opposite direction <strong>and</strong> zero-return is performed based on C-phase signal detection.<br />

Grid shift travel distance<br />

Operation (velocity waveform)<br />

In-position signal<br />

C-channel signal<br />

SDN signal<br />

4) Push zero detection: Type 3<br />

Zero-return is based on detecting a stop due to pushing against the mechanical end.<br />

Mechanical end<br />

Grid shift travel<br />

Operation (velocity waveform)<br />

In-position signal<br />

Comm<strong>and</strong> code 25h: Push complete<br />

determination time<br />

* The sign of the grid shift volume must be set to the opposite direction of the push direction.<br />

* Confirm that the push current limit setting is a value with which the motor can operate. If the<br />

value is low, a push may be prematurely determined as completed.<br />

5) Push + C-phase detection: Type 4<br />

After detecting a stop due to pushing against the mechanical end, movement starts in the<br />

opposite direction <strong>and</strong> zero-return is performed based on C-phase signal detection.<br />

Mechanical end<br />

Grid shift travel<br />

Operation<br />

In-position signal<br />

C-phase signal<br />

Comm<strong>and</strong> code 25h: Push complete<br />

determination time<br />

5-30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!