01.07.2014 Views

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-190-<br />

For the <strong>NASA</strong> Goddard Space Flight Center:<br />

<strong>The</strong> SMNS Progra. Director<br />

Goddard Space Flight Center<br />

Greenbelt, Hl 20771<br />

All matters which cannot be resolved by these organizations shall<br />

revert to the undersigned or their designates for resolution.<br />

3.2 GENERAL FINANCIAL POLICY: <strong>The</strong> DOD will provide funds for SHNS systems<br />

and equipment for STP missions on a firm-fixed price basis. <strong>NASA</strong> is<br />

liable for the developmental costs of the standard SMMS systems and<br />

equipment configurations. Pend<strong>in</strong>g def<strong>in</strong>ition of STP mission requirements<br />

and acceptable lease policies, STP may enter <strong>in</strong>to lease agreements<br />

with GSFC for reusable equipment.<br />

Specific f<strong>in</strong>ancial schedules<br />

will be developed on a mission by mission basis accord<strong>in</strong>g to the<br />

specific guidel<strong>in</strong>es <strong>in</strong> paragraph 5.<br />

4.0 ORGANIZATION RESPONSIBILITIES FOR THE SMMS SYSTEMS<br />

4.1 SMMS SYSTEMS REQUIREMENTS PREPARATION AND PROPOSAL EVALUATION<br />

4.1.1 General SlMfS requirements are provided <strong>in</strong> the SMMS Requirements<br />

Attachment to this Memorandum of Agreement.<br />

4.1.2 GSFC and STP are responsible jo<strong>in</strong>tly for the establishment of<br />

the detailed SMiS systems requirements, related exhibits and<br />

data requirements.<br />

4.1.3 GSFC will develop specifications, test and qualification criteria for<br />

the SMMS systems, subsystems and components.<br />

4.1.4 STP will review these specifications, test and qualification criteria<br />

for compliance with STP requirements.<br />

4.1.5 GSFC and STP are resp,,sible jo<strong>in</strong>tly for the preparation of all SMM4S<br />

systems acceptance lest criteria.<br />

4.1.6 GSFC will prepare the requst for proposal (RFP) accord<strong>in</strong>g to <strong>NASA</strong><br />

source<br />

eoee tJonprocetures.<br />

3

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!