A Case Study in NASA-DoD - The Black Vault
A Case Study in NASA-DoD - The Black Vault
A Case Study in NASA-DoD - The Black Vault
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
-66-<br />
Space Test Program position that its payloads always have a secondary<br />
status, they are always taken to an altitude of 150 n mi by the shuttle;<br />
solid rocket kick stages (not the IUS) are then used for translation<br />
<strong>in</strong>to the proper orbits. Both ETR and WTR launches of the shuttle are<br />
considered. It has been assumed that the shuttle cost of $15.4 million<br />
will be prorated by weight and that a service charge of $1 million per<br />
launch will be made.<br />
<strong>The</strong> number of spacecraft that would need to be procured for each<br />
of four different procurement options is shown <strong>in</strong> Table 9. <strong>The</strong> four<br />
options are:<br />
all-STPSS, all-MMS, AEM plus STPSS, and AEM plus MMS.<br />
An option consist<strong>in</strong>g of all three types of spacecraft would not be<br />
cost-effective <strong>in</strong> view of the magnitude of the nonrecurr<strong>in</strong>g cost associated<br />
with provid<strong>in</strong>g the STPSS-P, given that the program already <strong>in</strong>cludes<br />
the MMS.<br />
Table 9<br />
NUMBER OF SPACECRAFT<br />
(Nom<strong>in</strong>al case)<br />
Spacecraft<br />
Type<br />
Procurement Options<br />
STPSS MMS AEM/STPSS AEM/MMS<br />
AEM 0 0 3 4<br />
STPSS-S 0 0 0 0<br />
STPSS-LC 19 0 16 0<br />
STPSS-P 5 0 5 0<br />
MMS 0 24 0 20<br />
Total 24 24 24 24<br />
It can be seen that the STPSS-S configuration is never procured<br />
<strong>in</strong> the nom<strong>in</strong>al case, because there are only a few payloads that can be<br />
sp<strong>in</strong> stabilized, and they are distributed over the eight different<br />
orbits <strong>in</strong> such a way that it is always more costly to use an STPSS-S<br />
spacecraft than to load up the STPSS-LC or STPSS-P spacecraft.<br />