-66-<br />

Space Test Program position that its payloads always have a secondary<br />

status, they are always taken to an altitude of 150 n mi by the shuttle;<br />

solid rocket kick stages (not the IUS) are then used for translation<br />

<strong>in</strong>to the proper orbits. Both ETR and WTR launches of the shuttle are<br />

considered. It has been assumed that the shuttle cost of $15.4 million<br />

will be prorated by weight and that a service charge of $1 million per<br />

launch will be made.<br />

<strong>The</strong> number of spacecraft that would need to be procured for each<br />

of four different procurement options is shown <strong>in</strong> Table 9. <strong>The</strong> four<br />

options are:<br />

all-STPSS, all-MMS, AEM plus STPSS, and AEM plus MMS.<br />

An option consist<strong>in</strong>g of all three types of spacecraft would not be<br />

cost-effective <strong>in</strong> view of the magnitude of the nonrecurr<strong>in</strong>g cost associated<br />

with provid<strong>in</strong>g the STPSS-P, given that the program already <strong>in</strong>cludes<br />

the MMS.<br />

Table 9<br />

NUMBER OF SPACECRAFT<br />

(Nom<strong>in</strong>al case)<br />

Spacecraft<br />

Type<br />

Procurement Options<br />

STPSS MMS AEM/STPSS AEM/MMS<br />

AEM 0 0 3 4<br />

STPSS-S 0 0 0 0<br />

STPSS-LC 19 0 16 0<br />

STPSS-P 5 0 5 0<br />

MMS 0 24 0 20<br />

Total 24 24 24 24<br />

It can be seen that the STPSS-S configuration is never procured<br />

<strong>in</strong> the nom<strong>in</strong>al case, because there are only a few payloads that can be<br />

sp<strong>in</strong> stabilized, and they are distributed over the eight different<br />

orbits <strong>in</strong> such a way that it is always more costly to use an STPSS-S<br />

spacecraft than to load up the STPSS-LC or STPSS-P spacecraft.<br />

When<br />

consider<strong>in</strong>g programs with a larger number of payloads, the sp<strong>in</strong> configuration<br />

is <strong>in</strong>cluded <strong>in</strong> the procurement mix.