01.07.2014 Views

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

II<br />

-62-<br />

Table 8<br />

SPACECRAFT NONRECURRING COSTS<br />

(In millions of 1976 dollars)<br />

Estimates Based<br />

on SAMSO Model<br />

Estimates Based<br />

on Boe<strong>in</strong>g <strong>Study</strong><br />

Spacecraft STPSS L-AEM L-AEM<br />

Sp<strong>in</strong> 15.9 ....<br />

Low-cost (basel<strong>in</strong>e) 20.7 18.0 8.6<br />

Precision 23.4 19.6 9.1<br />

Sp<strong>in</strong> + low-cost 25.3 ....<br />

Sp<strong>in</strong> + precision 28.1 23.0 11.3<br />

Low-cost + precision 26.1 25.3 11.9<br />

Sp<strong>in</strong> + low-cost + precision 30.9 28.7 14.5<br />

Launch Costs<br />

<strong>The</strong> other major category of cost <strong>in</strong> the 10-year program considered<br />

is the cost to launch spacecraft and place them <strong>in</strong> orbit at the specified<br />

altitude and <strong>in</strong>cl<strong>in</strong>ation. <strong>The</strong> basic launch vehicle is the space<br />

shuttle, but at present neither the cost nor the guidel<strong>in</strong>es for allocat<strong>in</strong>g<br />

cost among users has been determ<strong>in</strong>ed. Estimates of cost range<br />

from $15 million to $30 million, of which the users may pay all or<br />

noth<strong>in</strong>g. <strong>The</strong> <strong>in</strong>tent of the study was not to estimate launch costs but<br />

to exam<strong>in</strong>e whether those costs could <strong>in</strong>fluence the choice of spacecraft.<br />

Consequently, launch costs were assigned to each payload based on a<br />

range of assumptions: Space shuttle launch cost was $15.4 million or<br />

$30 million. Costs are allocated on a basis of weight or accord<strong>in</strong>g<br />

to either of two <strong>NASA</strong>-proposed tariff schedules, or are not allocated<br />

at all, i.e., only a service charge is <strong>in</strong>curred.<br />

In the <strong>in</strong>itial phase of this study a <strong>NASA</strong> formula was suggested<br />

as a basis for prorat<strong>in</strong>g launch cost; it considered weight, length,<br />

<strong>in</strong>cl<strong>in</strong>ation, and altitude as <strong>in</strong>dependent variables, i.e.:<br />

SRU =<br />

.00215 length + .0238 length 2 + .000203 weight<br />

- .00000000169 weight - 000122 <strong>in</strong>cl<strong>in</strong>ation<br />

22<br />

+ .00442 <strong>in</strong>cl<strong>in</strong>ation + .00109 altitude + .000232 altitude 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!