01.07.2014 Views

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

A Case Study in NASA-DoD - The Black Vault

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

-194-<br />

5.2.1.1 <strong>NASA</strong> has developmental responsibility and f<strong>in</strong>ancial liability for<br />

the flight support system of the SMMS. DOD will fund <strong>NASA</strong> for the<br />

recurr<strong>in</strong>g production costs of FSS for STP use.<br />

5.2.1.2 Based on the STP mission frequency, cost and availability of NAA<br />

equipnent, DOD Is<br />

liable for user charges for the lease of flight<br />

support equipment at a mutually acceptable rate.<br />

5.2.2 Ground Suvport Eou<strong>in</strong>ment<br />

5.2.2.1 <strong>NASA</strong> has developmental responsibility and f<strong>in</strong>ancial liability for<br />

the ground support equipment ((SE) of the SMIS.<br />

DOD will fund <strong>NASA</strong><br />

for the recurr<strong>in</strong>g production costs of GSE for STP use.<br />

5.2.2.2 Based on the STP mission frequency, cost and availability of <strong>NASA</strong><br />

equipment, DOD is liable for user charges for the lease of ground<br />

support equipment at a mutually acceptable rate.<br />

5.3 SMMS SYSTEMS SOFTWARE AND DOCUMENTATION<br />

5-3.1 <strong>NASA</strong> is responsible for the costs attendant to the development and<br />

test of all SMMS<br />

systems software and SMtS documentation.<br />

5.3.2 DOD is rc:-ponsible for the cost required to tailor the StS software<br />

and documentation needed to satisfy unique STP mission requirements.<br />

5.4 SMMS SYSTEMS DESIGN CHANlF;S<br />

5.4.1 Pre-aw rrd Phase: <strong>NASA</strong> bears the responsibility and f<strong>in</strong>ancial<br />

liability for the costs of design changes dur<strong>in</strong>g the pre-award phase.<br />

5.1..2 Developmcnt Phase: <strong>NASA</strong> and DOD are responsible and cost liable as<br />

applicable for SMMS systems design changes which orig<strong>in</strong>ate from each<br />

respective agency.<br />

1i

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!