01.08.2014 Views

Work Programme - Statistics South Africa

Work Programme - Statistics South Africa

Work Programme - Statistics South Africa

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Table 1: Strategic plan targets (concluded)<br />

No.<br />

Audited/actual performance<br />

Estimated<br />

performance<br />

Medium-term targets<br />

Strategic<br />

objective Target 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15<br />

<br />

Provide and<br />

maintain<br />

an updated<br />

sampling<br />

frame for the<br />

collection of<br />

economic<br />

statistics<br />

Updated<br />

business<br />

sampling frame<br />

Improve<br />

utilisation of<br />

the business<br />

sampling<br />

frame by georeferencing<br />

businesses in<br />

the business<br />

sampling frame<br />

Further roll<br />

out georeferencing<br />

of<br />

businesses in<br />

the business<br />

sampling frame<br />

Develop<br />

proposal and<br />

plan to compile<br />

register-based<br />

statistics<br />

Produce<br />

register-based<br />

statistics at<br />

lower level<br />

<br />

102<br />

24. Establish<br />

a single<br />

integrated<br />

business<br />

registration<br />

system<br />

Implementation<br />

of a single<br />

business<br />

registration<br />

authority<br />

Signed MoU<br />

by Stats SA,<br />

the dti and<br />

SARS<br />

Development<br />

of single<br />

business<br />

registration<br />

system<br />

Phase 1:<br />

Implementation<br />

of single<br />

business<br />

registration<br />

system<br />

Phase 2:<br />

Implementation<br />

of single<br />

business<br />

registration<br />

system<br />

Full operational<br />

business<br />

registration<br />

system<br />

Target 24 for 2011/12, in terms of the implementation of a single business registration system Stats SA together with<br />

the related partners, cannot proceed unless Cabinet approval is received to proceed with consultation on the proposed<br />

legislative changes contemplated in the proposed Bill. Downstream implementation processes as indicated in the Strategic<br />

<br />

<br />

the <strong>South</strong> <strong>Africa</strong> I know, the home I understand

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!