Work Programme - Statistics South Africa
Work Programme - Statistics South Africa
Work Programme - Statistics South Africa
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
Table 1: Strategic plan targets<br />
No.<br />
Audited/actual performance<br />
Estimated<br />
performance<br />
Medium-term targets<br />
Strategic<br />
objective Target 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15<br />
<br />
<br />
60. Provide<br />
<br />
training<br />
Build capacity<br />
<br />
Training was<br />
not provided<br />
as scheduled<br />
Build provincial<br />
capacity in<br />
<br />
<br />
training<br />
to SANSS<br />
partners<br />
<br />
training<br />
to SANSS<br />
partners<br />
<br />
training<br />
to SANSS<br />
partners<br />
<br />
61. Develop and<br />
maintain<br />
geographic<br />
frame<br />
Update master<br />
sample for all<br />
9 provinces<br />
annually<br />
Updated<br />
master sample<br />
for 1 096 192<br />
dwellings<br />
Updated<br />
master sample<br />
in 7 provinces<br />
as scheduled<br />
Updated<br />
master<br />
sample only<br />
in 2 provinces<br />
(Western Cape<br />
and Northern<br />
Cape) as<br />
scheduled<br />
Master sample<br />
updates<br />
Master sample<br />
updates<br />
Master sample<br />
updates<br />
Master sample<br />
updates<br />
177<br />
<br />
62. Improve<br />
communication<br />
and<br />
stakeholder<br />
relations<br />
Stakeholder<br />
workshops<br />
conducted in<br />
all provinces<br />
Conducted<br />
9 <strong>Africa</strong><br />
<strong>Statistics</strong> Day<br />
workshops in<br />
the provinces<br />
Conducted 8<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Conducted 22<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Conduct 14<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Conduct 9<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Conduct 9<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Conduct 9<br />
stakeholder<br />
workshops in<br />
the provinces<br />
Strategic objective: Improve productivity and service delivery<br />
<br />
63. Integrate<br />
survey<br />
operations<br />
Response<br />
rate of 85%<br />
for household<br />
surveys<br />
Developed<br />
an integrated<br />
<br />
strategy<br />
Commenced<br />
with<br />
implementation<br />
of the<br />
integrated<br />
<br />
strategy<br />
Commenced<br />
with the rollout<br />
of the<br />
integrated<br />
<br />
strategy<br />
Roll out an<br />
integrated<br />
<br />
strategy<br />
Roll out an<br />
integrated<br />
<br />
strategy<br />
Roll out an<br />
integrated<br />
<br />
strategy<br />
Integrated<br />
<br />
force as part<br />
of a national<br />
footprint<br />
Integration of<br />
non-human<br />
resources<br />
Integration<br />
of human<br />
resources<br />
Implement<br />
a periodic<br />
household<br />
survey<br />
programme<br />
and create<br />
<br />
savings<br />
Implement<br />
an economic<br />
survey<br />
programme<br />
the <strong>South</strong> <strong>Africa</strong> I know, the home I understand