01.08.2014 Views

Work Programme - Statistics South Africa

Work Programme - Statistics South Africa

Work Programme - Statistics South Africa

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 1: Strategic plan targets<br />

No.<br />

Audited/actual performance<br />

Estimated<br />

performance<br />

Medium-term targets<br />

Strategic<br />

objective Target 2008/09 2009/10 2010/11 2011/12 2012/13 2013/14 2014/15<br />

<br />

<br />

60. Provide<br />

<br />

training<br />

Build capacity<br />

<br />

Training was<br />

not provided<br />

as scheduled<br />

Build provincial<br />

capacity in<br />

<br />

<br />

training<br />

to SANSS<br />

partners<br />

<br />

training<br />

to SANSS<br />

partners<br />

<br />

training<br />

to SANSS<br />

partners<br />

<br />

61. Develop and<br />

maintain<br />

geographic<br />

frame<br />

Update master<br />

sample for all<br />

9 provinces<br />

annually<br />

Updated<br />

master sample<br />

for 1 096 192<br />

dwellings<br />

Updated<br />

master sample<br />

in 7 provinces<br />

as scheduled<br />

Updated<br />

master<br />

sample only<br />

in 2 provinces<br />

(Western Cape<br />

and Northern<br />

Cape) as<br />

scheduled<br />

Master sample<br />

updates<br />

Master sample<br />

updates<br />

Master sample<br />

updates<br />

Master sample<br />

updates<br />

177<br />

<br />

62. Improve<br />

communication<br />

and<br />

stakeholder<br />

relations<br />

Stakeholder<br />

workshops<br />

conducted in<br />

all provinces<br />

Conducted<br />

9 <strong>Africa</strong><br />

<strong>Statistics</strong> Day<br />

workshops in<br />

the provinces<br />

Conducted 8<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Conducted 22<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Conduct 14<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Conduct 9<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Conduct 9<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Conduct 9<br />

stakeholder<br />

workshops in<br />

the provinces<br />

Strategic objective: Improve productivity and service delivery<br />

<br />

63. Integrate<br />

survey<br />

operations<br />

Response<br />

rate of 85%<br />

for household<br />

surveys<br />

Developed<br />

an integrated<br />

<br />

strategy<br />

Commenced<br />

with<br />

implementation<br />

of the<br />

integrated<br />

<br />

strategy<br />

Commenced<br />

with the rollout<br />

of the<br />

integrated<br />

<br />

strategy<br />

Roll out an<br />

integrated<br />

<br />

strategy<br />

Roll out an<br />

integrated<br />

<br />

strategy<br />

Roll out an<br />

integrated<br />

<br />

strategy<br />

Integrated<br />

<br />

force as part<br />

of a national<br />

footprint<br />

Integration of<br />

non-human<br />

resources<br />

Integration<br />

of human<br />

resources<br />

Implement<br />

a periodic<br />

household<br />

survey<br />

programme<br />

and create<br />

<br />

savings<br />

Implement<br />

an economic<br />

survey<br />

programme<br />

the <strong>South</strong> <strong>Africa</strong> I know, the home I understand

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!