15.11.2014 Views

Risk Management and Value Creation in ... - Arabictrader.com

Risk Management and Value Creation in ... - Arabictrader.com

Risk Management and Value Creation in ... - Arabictrader.com

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Index 321<br />

at the transaction level, 249–254<br />

constant, 97<br />

decrease <strong>in</strong>, 156, 280<br />

effects of changes <strong>in</strong>, 140, 246, 283<br />

excessive, 95, 99, 146<br />

<strong>in</strong>crease <strong>in</strong>, 96, 123, 126, 130,<br />

288–289<br />

optimal, 138. See also Capital<br />

structure, optimal<br />

Liability(ies):<br />

(default-free) customer, 154<br />

fixed, 154<br />

junior, 156–157<br />

limited, 101, 121, 149, 221<br />

off-balance sheet, 165, 226–227,<br />

231<br />

on-balance sheet, 149, 165, 226<br />

Liability holder(s), 3, 122, 141<br />

Liability management, 2, 15<br />

Likelihood of bank default, 22–23,<br />

42, 82<br />

Likelihood of default, 79, 81, 89–90,<br />

125, 132, 288. See also<br />

Probability of default<br />

central role of, 80<br />

Limit sett<strong>in</strong>g. See <strong>Risk</strong>, limit<strong>in</strong>g<br />

Liquidation, 107, 191, 215<br />

Liquidity, 3, 28, 109, 157, 165, 186,<br />

191, 197, 230<br />

Loan loss reserves, 140, 148, 161,<br />

171. See also Reserves, loan<br />

loss<br />

Loan(s), 25, 42, 79, 113, 145, 149,<br />

170, 174, 176, 179–180, 186,<br />

260<br />

pric<strong>in</strong>g, 171, 273<br />

secured, 175, 177<br />

unsecured, 177<br />

Loan orig<strong>in</strong>ation, 281<br />

Loan portfolio, 140, 161, 176, 181,<br />

186<br />

Loss(es):<br />

actual, 174<br />

actuarial 152. See also Loss(es),<br />

expected or credit<br />

credit, 5, 169, 171, 175–176, 184,<br />

239, 243–244, 276, 282, 285<br />

economic, 152, 170<br />

expected (credit), 5, 74, 145, 150–<br />

151, 158, 161, 171–173, 175–<br />

176, 178–179, 182, 198, 201–<br />

203, 210, 217, 243, 251, 263,<br />

268<br />

expected, due to event risk, 203<br />

maximum, 168<br />

residual, 81, 153<br />

unexpected, 5, 74, 145, 150, 175–<br />

183, 185, 198, 202–203, 263,<br />

268<br />

contribution, 171, 175, 178–180,<br />

182–183<br />

st<strong>and</strong>alone, 171, 176<br />

Loss given default (LGD), 111, 172<br />

Loss <strong>in</strong> the event of default (LIED).<br />

See Loss given default (LGD)<br />

Loss leader, 262<br />

Loss prevention by process control,<br />

278<br />

Loss rate (LR), 172–179, 198<br />

Loss volatility, 180, 215<br />

Lottery ticket, 168<br />

Lower partial moment (LPM), 217–218<br />

Lower-tail out<strong>com</strong>e(s), 23, 30, 33, 39,<br />

112, 132, 135, 168, 225, 288–<br />

290<br />

Loyalty, 89<br />

LR. See Loss rate (LR)<br />

Lump<strong>in</strong>ess, 185, 202. See also<br />

Concentration<br />

M&A. See Mergers <strong>and</strong> acquisitions<br />

M&M:<br />

assumptions of, 59, 63, 68, 71, 78,<br />

102, 138<br />

capital structure irrelevance<br />

proposition, 64<br />

proposition I, turn<strong>in</strong>g upside down,<br />

78–79<br />

proposition(s), 59, 83, 98, 129,<br />

138, 249<br />

risk class, 2, 72<br />

<strong>Management</strong><br />

action, normative, 265<br />

<strong>in</strong>centive structure, 77

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!