asphalt pavement. 40 mm asphalt surfacing would be used on a few heavily trafficked upazila<br />
roads.<br />
Concrete Surfacing<br />
9. Besides flexible pavement, the concept of causeway could be introduced in Sunamgonj<br />
district and other such low lying areas which are prone to flash floods. The typical concrete<br />
pavement for causeway consisted of the following:<br />
Table 9.5: RCC Causeway<br />
Layer Thickness Materials<br />
RCC slab 200 mm Crushed stone, sand, cement and steel<br />
reinforcement<br />
Sub-base 150 mm Stone chips<br />
Improved sub-grade 250 mm Sand<br />
10. Concrete surfacing based on rigid pavement concept could be used in some Union Roads<br />
in Sylhet and other regions. The typical concrete pavement used on Union Roads consisted of the<br />
following:<br />
Table 9.6: RCC Pavement Union Road<br />
Layer Thickness Materials<br />
RCC slab 200 mm Crushed stone, sand, cement and steel reinforcement.<br />
Improved sub-grade 150 mm Sand.<br />
BRIDGE DESIGN<br />
11. Bridges on UZRs will be designed to AASHTO H-20 to Loading. The following cost<br />
effective design measures will be adopted:<br />
• Avoiding high abutments by increasing waterway openings where necessary.<br />
• Designing for efficient use of steel reinforcement<br />
• Using return type, rather than splayed wing walls.<br />
• Designing bridges for double lane traffic (5.50 m).<br />
12. The decks will be designed to have a 0.6 meter clearance above the 50 year high flood<br />
level on non-navigable rivers. On navigable rivers the clearance will be varied from 1.0 meters to<br />
1.50 meters according to requirements. High water levels will be determined from hydrological<br />
studies. However in practice many of these high flood levels will be determined following<br />
discussions with local people and observing watermarks of previous floods on buildings and<br />
other structures.<br />
13. Bridge length exceeding 30 meters will be designed for 50 years flood level and bridges<br />
length of less than 30 meters will be designed for 20 year flood level.<br />