asphalt pavement. 40 mm asphalt surfacing would be used on a few heavily trafficked upazila<br />

roads.<br />

Concrete Surfacing<br />

9. Besides flexible pavement, the concept of causeway could be introduced in Sunamgonj<br />

district and other such low lying areas which are prone to flash floods. The typical concrete<br />

pavement for causeway consisted of the following:<br />

Table 9.5: RCC Causeway<br />

Layer Thickness Materials<br />

RCC slab 200 mm Crushed stone, sand, cement and steel<br />

reinforcement<br />

Sub-base 150 mm Stone chips<br />

Improved sub-grade 250 mm Sand<br />

10. Concrete surfacing based on rigid pavement concept could be used in some Union Roads<br />

in Sylhet and other regions. The typical concrete pavement used on Union Roads consisted of the<br />

following:<br />

Table 9.6: RCC Pavement Union Road<br />

Layer Thickness Materials<br />

RCC slab 200 mm Crushed stone, sand, cement and steel reinforcement.<br />

Improved sub-grade 150 mm Sand.<br />

BRIDGE DESIGN<br />

11. Bridges on UZRs will be designed to AASHTO H-20 to Loading. The following cost<br />

effective design measures will be adopted:<br />

• Avoiding high abutments by increasing waterway openings where necessary.<br />

• Designing for efficient use of steel reinforcement<br />

• Using return type, rather than splayed wing walls.<br />

• Designing bridges for double lane traffic (5.50 m).<br />

12. The decks will be designed to have a 0.6 meter clearance above the 50 year high flood<br />

level on non-navigable rivers. On navigable rivers the clearance will be varied from 1.0 meters to<br />

1.50 meters according to requirements. High water levels will be determined from hydrological<br />

studies. However in practice many of these high flood levels will be determined following<br />

discussions with local people and observing watermarks of previous floods on buildings and<br />

other structures.<br />

13. Bridge length exceeding 30 meters will be designed for 50 years flood level and bridges<br />

length of less than 30 meters will be designed for 20 year flood level.<br />