proposed project will support the strengthening of the Environmental Unit and also the training<br />

of the <strong>LGED</strong> officials and staff on environmental management.<br />

45. Environmental Safeguard Supervision and Monitoring. The Project Environmental<br />

Unit headed by an Executive Engineer already set-up under the Project Management Unit (PMU)<br />

of the Rural Transport Improvement Project (RTIP-I) will continue to coordinate the<br />

environmental safeguard issues of the proposed RTIP-II. The field level engineers will be trained<br />

to supervise the regular implementation of the environmental management activities. The project<br />

will support two fulltime Junior Environment Specialist in Design and Supervision Consultancy.<br />

The specialists will prepare subproject specific environment screening/assessment report with<br />

EMP, supervise the implementation of EMP and support capacity building of the field level staff<br />

of <strong>LGED</strong> and contractor. A Senior Environment Specialist under the Management Support<br />

Consultancy will review the quality of the environmental screening/assessment and EMP.<br />

46. The project will implement an environmental monitoring program (i) to monitor the<br />

contractor’s work during project implementation in order to check contractual compliance with<br />

specified mitigation measures, and subsequently (ii) to assess the actual environmental impacts<br />

of the project over the years following completion of the various project components. The Senior<br />

Environment Specialist will design the detailed monitoring plan of the project and prepare a<br />

routine monitoring report based on the monitoring results by <strong>LGED</strong> and the Junior Consultants.<br />

In addition, the integrated performance audit will cover environmental aspects of the project and<br />

compliance with EMF/EMPs as well as World Bank safeguard policies. The Bank would also<br />

supervise the environmental compliance as part of regular implementation support missions.<br />

47. Grievance Redress System. Environmental issues will be integrated into the project<br />

Suggestions and Complaints Mechanism (SCM). A Grievance Redress Committee (GRC) at<br />

Upazila level and a Suggestions and Complaints Committee (SCC) at the District level will be<br />

formed and functioned under the SCM. The Office of the Upazila Engineer and Office of the<br />

Executive Engineer at District level will serve as the secretariat of each GRC and SCC<br />

respectively. All complaints will be received at the Office of the Upazila Engineer through the<br />

Community Organizer. If the aggrieved persons are not satisfied with the local level resolution,<br />

the GRC will forward the case records to the SCC. Further recourse will be provided by the PD<br />

and at a higher level by the MLGRD&C. A decision agreed with the aggrieved person(s) at any<br />

level of hearing will be binding upon <strong>LGED</strong>. All suggestions, complaints and grievances<br />

received at SCC and at GRC will be well documented. Paragraph 56 below further describes the<br />

SCM set up.<br />

48. Consultation and Disclosure. The EMF was prepared in consultation with the key<br />

stakeholders including <strong>LGED</strong> field level staffs, contractors and communities. A national<br />

consultation workshop was organized by <strong>LGED</strong> on February 7, 2012 to share the draft EMF and<br />

SMF with all the stakeholders. Consultation with communities has been made mandatory for<br />

environmental screening/assessment of each subproject. Considering the piloting experience of<br />

RTIP-I, the project will display the environmental management plan with costing in a billboard<br />

at the project site. The EMF along with Bangla version has been disclosed by the <strong>LGED</strong> on their<br />

website on December 22, 2011and hardcopies have been also available at <strong>LGED</strong> headquarters<br />

and district offices (project area). Advertisement requesting public comments has been published<br />