Annex 12: Rural Water Transport Improvement Sub-Component Risk Mitigation Matrix<br />
Bangladesh: Second Rural Transport Improvement Project (P123828)<br />
Issues Risk Mitigation Response from <strong>LGED</strong><br />
Institutional <strong>LGED</strong>'s lack of authority for the<br />
implementation of this<br />
component.<br />
<strong>LGED</strong> to provide a policy letter to the Bank<br />
confirming their responsibility for this<br />
component (prior to negotiation).<br />
Chief Engineer issued to<br />
World Bank.<br />
Technical<br />
Lack of coordination among<br />
related agencies.<br />
Lack of capacity at <strong>LGED</strong>.<br />
Insufficient Technical<br />
information.<br />
Form a coordination committee among<br />
BIWTA, BWDB, MOS and <strong>LGED</strong> to avoid<br />
over lapping of activities for the selected<br />
river routes (prior to the Board approval).<br />
Appoint IWT consultant (before<br />
effectiveness).<br />
Carry out hydrographic survey.<br />
Carry out sediment transport study.<br />
Select the type of dredger depending on<br />
dredging quantity.<br />
Chief Engineer would issue a<br />
circular forming a committee<br />
at district level for<br />
coordination.<br />
Agreed.<br />
- Done in 1st canal.<br />
- Would be done in 2nd<br />
canal.<br />
Select the dredging spoil location.<br />
Social Lack of detail information. Select landing stations in consultation with<br />
stakeholders (providing gender equity).<br />
Carry out SIA and prepare SMP for each<br />
river route.<br />
- Done in 1st canal.<br />
- Would be done in 2nd<br />
canal.<br />
- Collect additional Data<br />
required.<br />
Environmental Lack of detail information.<br />
Monitoring<br />
Lack of monitoring may affect<br />
the pilot component.<br />
Confirm that if any land is needed it will be<br />
procured in time as required by the SIMF.<br />
Carry out EIA for the selected river routes<br />
and prepare EMP.<br />
Carry out quality of dredged material.<br />
Ensure effective monitoring through regular<br />
supervision.<br />
Agreed<br />
- Done in 1st one.<br />
- Would be done in 2nd<br />
one.<br />
Agreed.<br />