Annex 12: Rural Water Transport Improvement Sub-Component Risk Mitigation Matrix<br />

Bangladesh: Second Rural Transport Improvement Project (P123828)<br />

Issues Risk Mitigation Response from <strong>LGED</strong><br />

Institutional <strong>LGED</strong>'s lack of authority for the<br />

implementation of this<br />

component.<br />

<strong>LGED</strong> to provide a policy letter to the Bank<br />

confirming their responsibility for this<br />

component (prior to negotiation).<br />

Chief Engineer issued to<br />

World Bank.<br />

Technical<br />

Lack of coordination among<br />

related agencies.<br />

Lack of capacity at <strong>LGED</strong>.<br />

Insufficient Technical<br />

information.<br />

Form a coordination committee among<br />

BIWTA, BWDB, MOS and <strong>LGED</strong> to avoid<br />

over lapping of activities for the selected<br />

river routes (prior to the Board approval).<br />

Appoint IWT consultant (before<br />

effectiveness).<br />

Carry out hydrographic survey.<br />

Carry out sediment transport study.<br />

Select the type of dredger depending on<br />

dredging quantity.<br />

Chief Engineer would issue a<br />

circular forming a committee<br />

at district level for<br />

coordination.<br />

Agreed.<br />

- Done in 1st canal.<br />

- Would be done in 2nd<br />

canal.<br />

Select the dredging spoil location.<br />

Social Lack of detail information. Select landing stations in consultation with<br />

stakeholders (providing gender equity).<br />

Carry out SIA and prepare SMP for each<br />

river route.<br />

- Done in 1st canal.<br />

- Would be done in 2nd<br />

canal.<br />

- Collect additional Data<br />

required.<br />

Environmental Lack of detail information.<br />

Monitoring<br />

Lack of monitoring may affect<br />

the pilot component.<br />

Confirm that if any land is needed it will be<br />

procured in time as required by the SIMF.<br />

Carry out EIA for the selected river routes<br />

and prepare EMP.<br />

Carry out quality of dredged material.<br />

Ensure effective monitoring through regular<br />

supervision.<br />

Agreed<br />

- Done in 1st one.<br />

- Would be done in 2nd<br />

one.<br />

Agreed.<br />

122