provision, access and efficiency; 2) increased share of population with access to all-season roads;<br />

3) enhanced disaster preparedness; and 4) expanded participation in local development and<br />

women’s economic empowerment.<br />

II.<br />

PROJECT DEVELOPMENT OBJECTIVE<br />

A. Project Development Objective (PDO)<br />

19. To improve rural accessibility in project areas (covering 26 districts) and strengthen<br />

institutional capacity for sustainable rural road maintenance.<br />

B. Project Beneficiaries<br />

20. Physical infrastructure improvements under RTIP-II are expected to reduce rural poverty<br />

and stimulate economic development of rural communities in the 26 districts project: 2 west and<br />

24 east of the Jamuna river, excluding the Chittagong Hill Tracts (which are covered by an Asian<br />

Development Bank-funded project). The choice of the districts was made in coordination with<br />

other development partners to avoid geographical overlap of projects. The project is expected to<br />

have approximately 22 million beneficiaries. The project will generate substantial direct short<br />

and longer-term employment for the poor, including disadvantaged women and other vulnerable<br />

groups.<br />

C. PDO Level Results Indicators<br />

21. The following indicators are proposed to evaluate achievement of the PDO. A more<br />

detailed list of project indicators and their respective baseline and annual target values can be<br />

found in Annex 1:<br />

• Population living within two km of all-season roads in 26 project districts, which is an IDA<br />

rural accessibility indicator (core indicator);<br />

• Percentage of roads in good condition in 26 project districts;<br />

• Increase in the level of road user and community satisfaction in the influence area; and<br />

• Maintenance funding needs are increasingly met in the project districts;<br />

III.<br />

PROJECT DESCRIPTION<br />

A. Project Components<br />

22. The project rationale is to scale up the accomplishments in the rural roads infrastructure<br />

under the ongoing RTIP-I and to further expand on it by adding improvements in the inland<br />

water transportation and introducing performance based (routine and periodic) maintenance<br />

contracts of the rural roads. Therefore, RTIP-II consists of the following components andmore<br />

information on these components can also be found in Annex 2.<br />

Component A: Accessibility Improvement (US$338.1 million):<br />

6