Overall Risk<br />
Provide adequate training on quality assurance to local contractors prior to the start of the works.<br />
Resp:<br />
Client Stage: Imple<br />
mentat<br />
ion<br />
Risk Management:<br />
Recurrent:<br />
Due<br />
Date:<br />
Prepare quality assurance guidelines in local language.<br />
Resp:<br />
Client Stage: Prepar<br />
ation<br />
Risk Management:<br />
Recurrent:<br />
Due<br />
Date:<br />
Performance assessment are included in the contracts of supervision consultants.<br />
Resp: Stage: Prepar<br />
ation<br />
Risk Management:<br />
Recurrent:<br />
Due<br />
Date:<br />
30-Apr-2013 Frequency: Status: Not Yet<br />
Due<br />
31-Dec-2013 Frequency: Status: Not Yet<br />
Due<br />
31-Dec-2012 Frequency: Status: In<br />
Progress<br />
Engage a Project Management Consultant to support <strong>LGED</strong> in ensuring quality control.<br />
Resp: Stage: Imple<br />
mentat<br />
ion<br />
Recurrent:<br />
Due<br />
Date:<br />
Preparation Risk Rating: Substantial Implementation Risk Rating: Substantial<br />
Description:<br />
The risk rating for the project is assessed as substantial to reflect the overall<br />
weak governance environment in the country and complexity of the project<br />
which will cover 26 districts and will aim to upgrade, rehabilitate and maintain a<br />
large portion of the <strong>LGED</strong> road network and will support institutional<br />
strengthening agenda for the <strong>LGED</strong>. Unbiased selection of roads is a major<br />
challenge and is expected to be mitigated by an agreed selection methodology.<br />
The risks of stretched and limited capacity of <strong>LGED</strong> to implement the project in<br />
26 districts, potential risks with land acquisition and governance risks add to the<br />
challenge. Prior experience of the <strong>LGED</strong> in satisfactorily implementing the<br />
RTIP-I and agreed measures are expected to mitigate risks during<br />
implementation.<br />
Description:<br />
31-Dec-2012 Frequency: Status: Not Yet<br />
Due<br />
Risk during implementation is assessed as substantial to reflect the risks of<br />
stretched and limited capacity to implement the project in 26 districts, potential<br />
risks with land acquisition and governance risks. Prior experience of the <strong>LGED</strong><br />
in satisfactorily implementing the RTIP-I and agreed risk mitigation measures<br />
are expected to mitigate implementation risks.<br />